Laserfiche WebLink
J&T Consulting, Inc. Prowers Aggregate Operators LLC <br /> West Farm Pit <br /> 8/21/2018 <br /> FReclamation Bond Quantities and Costs <br /> Cemmdthm XKe. <br /> Phases 8, 9, 11, 12(9 50+9 47+9 75+10.66=39 38 acres)(Slurry wall has been constructed and leak test approved by State) <br /> Reclamation Operation Quantity Unit Unit Cost C ost <br /> Active Mining Area <br /> 20%Cost of Slurry Wall Required to Close Phases 5-12(60'avg Depth) 9,350 If $48 $448,800 <br /> Topsoil Area Above Water Required for Phases 8,9, 11, 12 499 ac $2,541 $12,680 <br /> Revegetate Area Above Water Required for Phases 8,9, 11, 12 4.99 ac $1,100 $5,491 <br /> Total Direct Cost $466,970 <br /> Overhead and Profit Cost(13 07%) $61,033 <br /> Contract Cost $528,003 <br /> Project Management(7 00%) $32,688 <br /> Additional Financial Warranty Required For Phases 8,9, 11,12 $560,691 <br /> Phases 7, 10(9 35+9 36=18 71 acres) <br /> eC amation Operation Quantity Unit nit ost OSt <br /> Active Mining Area <br /> Credit for Topsoil Area Above Water Required for Phases 8,9, 11, 12 (4 99) ac $2,541 -$12,680 <br /> Credit for Revegetated Area Above Water Required for Phases 8,9, 11, 12 (4 99) ac $1,100 -$5,491 <br /> Topsoil Area Above Water Required for Phases 7-12 6.51 ac $2,541 $16,542 <br /> Revegetate Area Above Water Required for Phases 7-12 6.51 ac $1,100 $7 163 <br /> Total Direct Cost $5,535 <br /> Overhead and Profit Cost(13 07%) $723 <br /> Contract Cost $6,258 <br /> Project Management(7 00%) $387 <br /> Additional Financial Warranty Required For Phases 7,10 $6,646 <br /> Phase 5,6(9 08+9.49=18 57 acres) <br /> Reclamation Operation Quantity Unit Unit ost ost <br /> Active Mining Area <br /> Credit for Topsoil Area Above Water Required for Phases 7-12 (6 51) ac $2,541 -$16,542 <br /> Credit for Revegetated Area Above Water Required for Phases 7-12 (6 51) ac $1,100 -$7,163 <br /> Topsoil Area Above Water Required for Phases 5-12 8.29 ac $2,541 $21,065 <br /> Revegetate Area Above Water Required for Phases 5-12 829 ac $1,100 $9,122 <br /> Total Direct Cost $6,482 <br /> Overhead and Profit Cost(13 07%) $847 <br /> Contract Cost $7,329 <br /> Project Management(7.00%) $454 <br /> Additional Financial Warranty Required For Phases 5,6 $7,782 <br /> 3of5 <br />