Laserfiche WebLink
J&T Consulting, Inc. Prowers Aggregate Operators LLC <br /> West Farts Pit <br /> 8/21/2018 <br /> FReclamation Bond Quantities and Costs <br /> Consuldna lRe. <br /> Non-Mining Areas(Wash Plant,Conveyor,Product Storage/Loadout,Sand/Overburden/Topsoil Stockpile Areas) <br /> Reclamation Operation Quantity Unit Unit Cost Costl <br /> Overburden Stockpile Area <br /> Scarify Ground in Disturbed Area 1046 ac $322 $3,363 <br /> Topsoil Disturbed Area 1046 ac $2,541 $26,579 <br /> Revegetate Disturbed Area ac $1,100 $0 <br /> Temporary Stockpile Areas(Surface only in Phase 13) <br /> Scarifying Ground in Disturbed Area 11 56 ac $322 $3,717 <br /> Topsoil Placement in Disturbed Area 11 56 ac $2,541 $29,374 <br /> Revegetate Disturbed Area 11 56 ac $1,100 $12,720 <br /> Temporary Stockpile Areas(Surface only in Phase 14) <br /> Scarifying Ground in Disturbed Area 11 51 ac $322 $3,701 <br /> Topsoil Placement in Disturbed Area 11 51 ac $2,541 $29,247 <br /> Revegetate Disturbed Area 11 51 ac $1,100 $12,665 <br /> Temporary Stockpile Areas(Surface only in Phase 15) <br /> Scarifying Ground in Disturbed Area 11.43 ac $322 $3,675 <br /> Topsoil Placement in Disturbed Area 11.43 ac $2,541 $29,044 <br /> Revegetate Disturbed Area 11.43 ac $1,100 $12,577 <br /> Temporary Stockpile Areas(Surface only in Phase 16) <br /> Scarifying Ground in Disturbed Area 11 13 ac $322 $3,579 <br /> Topsoil Placement in Disturbed Area 11 13 ac $2,541 $28,282 <br /> Revegetate Disturbed Area 11 13 ac $1,100 $12,247 <br /> Temporary Stockpile Areas(Surface only in Phase 17) <br /> Scarifying Ground in Disturbed Area 11 78 ac $322 $3,788 <br /> Topsoil Placement in Disturbed Area 11.78 ac $2,541 $29,933 <br /> Revegetate Disturbed Area 11.78 ac $1,100 $12,962 <br /> Parcel B Area <br /> Scarifying Ground in Disturbed Area 2308 ac $322 $7,421 <br /> Topsoil Placement in Disturbed Area 2308 ac $2,541 $58,647 <br /> Revegetate Disturbed Area 2308 ac $1,100 $25,395 <br /> Wash Plant Area <br /> Scarifying Ground in Disturbed Area 913 ac $322 $2,936 <br /> Topsoil Placement in Disturbed Area 9 13 ac $2,541 $23,200 <br /> Revegetate Disturbed Area 913 ac $1,100 $10,046 <br /> Conveyor Area <br /> Scarifying Ground in Disturbed Area 064 ac $322 $206 <br /> Topsoil Placement in Disturbed Area 064 ac $2,541 $1,626 <br /> Revegetate Disturbed Area 064 ac $1,100 $704 <br /> Mobilization 100 Is $13,592 $13,592 <br /> Total Direct Cost $401,226 <br /> Overhead and Profit Cost(13 07%) $52,440 <br /> Contract Cost $453,666 <br /> Project Management(7 00%) $28,086 <br /> Financial Warranty Required For Non-Minis Areas $481,752 <br /> Phases 11.4(9 25+9 12+9 81+9 60=37.78 acres)(Slurry wall has been constructed and leak test approved by State) <br /> ec amation Operation Quantity Unit Unit Cost Costi <br /> 20%Cost of Slurry Wall Required to Close Phases 1-4(70'avg Depth) 5,448 If $56 $305,088 <br /> Release of Bond for Approved Slurry Wall Not Adjacent to Active Mining (2,724) If $56 -$152,544 <br /> Topsoil Area Above Water Required for Phases 1-4 501 ac $2,541 $12,726 <br /> Revegetate Area Above Water Required for Phases 1-4 501 ac $1,100 $5,511 <br /> Total Direct Cost $170,781 <br /> Overhead and Profit Cost(13 07%) $22,321 <br /> Contract Cost $193,102 <br /> Project Management(7.00%) $11,955 <br /> Financial Warranty Required For Phases 1-4 $205,057 <br /> 2 of 5 <br />