My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-10-22_REVISION - M2008078 (15)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2008078
>
2018-10-22_REVISION - M2008078 (15)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2025 6:43:08 AM
Creation date
10/23/2018 10:04:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008078
IBM Index Class Name
Revision
Doc Date
10/22/2018
Doc Name Note
Part 5 of 6
Doc Name
Request For Amendment To Permit
From
Prowers Aggregate Operators, LLC
To
DRMS
Type & Sequence
AM1
Email Name
AME
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J&T Consulting, Inc. Prowers Aggregate Operators LLC <br /> West Farm Pit <br /> 8/21/2018 <br /> FReclamation Bond Quantities and Costs <br /> Consnitin&Ine. <br /> Phase 16(11 13 acres) <br /> Reclamation Operation Quantity Unit Unit Cost Cost <br /> Active Mining Area <br /> Credit for Scarifying Ground in Temporary Stockpile Disturbed Area (11 13) ac $322 -$3,579 <br /> Credit for Topsoil Placement in Temporary Stockpile Disturbed Area (11 13) ac $2,541 -$28,282 <br /> Credit for Revegetate Disturbed Area in Temporary Stockpile Disturbed Area (11 13) ac $1,100 -$12,247 <br /> Credit for Topsoil Area Above Water Required for Phases 13-15 (5 30) ac $2,541 -$13,463 <br /> Credit for Revegetated Area Above Water Required for Phases 13-15 (5 30) ac $1,100 -$5,830 <br /> Topsoil Area Above Water Required for Phases 13-16 522 ac $2,541 $13,270 <br /> Revegetate Area Above Water Required for Phases 13-16 5.22 ac $1,100 $5,746 <br /> Total Direct Cost -$44,385 <br /> Overhead and Profit Cost(13 07%) -$5,801 <br /> Contract Cost -$50,186 <br /> Project Management(7.00%) -$3,107 <br /> Additional Financial Warranty Required For Phase 16 -$53,293 <br /> Phase 17(11 78 acres) <br /> Reclamation Operation Quantity Unit Unit Cost Cost <br /> Active Mining Area <br /> Credit for Scarifying Ground in Temporary Stockpile Disturbed Area (11 78) ac $322 -$3,788 <br /> Credit for Topsoil Placement in Temporary Stockpile Disturbed Area (11 78) ac $2,541 -$29,933 <br /> Credit for Revegetate Disturbed Area in Temporary Stockpile Disturbed Area (11 78) ac $1,100 -$12,962 <br /> Credit for Topsoil Area Above Water Required for Phases 13-16 (5 22) ac $2,541 -$13,270 <br /> Credit for Revegetated Area Above Water Required for Phases 13-16 (5 22) ac $1,100 -$5,746 <br /> Topsoil Area Above Water Required for Phase 13-17 672 ac $2,541 $17,078 <br /> Revegetate Area Above Water Required for Phase 13-17 672 ac $1,100 $7,395 <br /> Total Direct Cost -$41,226 <br /> Overhead and Profit Cost(13.07%) -$5,388 <br /> Contract Cost -$46,614 <br /> Project Management(7 00%) -$2,886 <br /> Additional Financial Warranty Required For Phase 17 -$49,500 <br /> Total Financial Warranty Required For All Phases $1,894,586 <br /> 5 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.