My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-09-25_REVISION - M2014043
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2014043
>
2018-09-25_REVISION - M2014043
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2025 5:09:01 AM
Creation date
9/25/2018 3:01:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2014043
IBM Index Class Name
REVISION
Doc Date
9/25/2018
Doc Name
Request for Technical Revision
From
DRMS
To
Albert Frei & Sons
Type & Sequence
TR1
Email Name
JLE
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Albert Frei and Sons, Inc. September 24, 2018 <br /> Hatchery Pit - Technical Revision 01 <br /> deep well in their compound south of the mined area . Neither <br /> well is up gradient from Stage 2 and their tops are lower then <br /> the elevation of the shale under Stage 2 . These wells will not <br /> be impacted by dewatering in Stage 2 . <br /> Reclamation Plan Pre-1981 Lake Area <br /> During site preparations the pre-1981 northwest lake was <br /> dewatered and gravel left from the original mining operation was <br /> salvaged from the bottom. At that time it was determined that <br /> the underwater volume of this area was sufficient to hold the <br /> wash tailings from the processing operations, leaving Stage 1 as <br /> inert fill area . The Army Corp' s of Engineers determined the lake <br /> is not Waters of the US, so backfilling is allowed. A dike made <br /> of shale from the lake bottom was built to divide the lake into a <br /> freshwater source on the west side and a silt pond on the east . <br /> The eastern part of the pre-1981 lake, silt pond area, will be <br /> filled to the original ground elevation around the lake or <br /> approximately 50681 . The filled area, dike and lake perimeter <br /> will be reclaimed using the approved methods shown on Map <br /> Exhibits E-1 thru E-3 or Map Exhibit F . The area backfilled may <br /> be used as Industrial area as shown on Option 2 so it would be <br /> graded and graveled. The lake slopes would be resoiled and <br /> seeded. If the silted in area will be reclaimed it will be done <br /> following the approved resoiling and seeding plans . <br /> The western portion of the lake will remain as lake area. In the <br /> lake areas the south, west and north underwater shores were not <br /> disturbed so do not need reclamation and the west side of the <br /> dike was graded 3h to lv before the lake was allowed to refill . <br /> Map Exhibit C-1 Mining Plan Map has been revised to show the <br /> current conditions in the northwest lake area and the proposed <br /> location of the compacted liner and french drain in Stage 2 . <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.