My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-09-18_PERMIT FILE - M2018048
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2018048
>
2018-09-18_PERMIT FILE - M2018048
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2025 4:49:51 AM
Creation date
9/18/2018 2:33:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2018048
IBM Index Class Name
PERMIT FILE
Doc Date
9/18/2018
Doc Name
Adequacy Review Response
From
SEMA Construction
To
DRMS
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Subcontract#: 061804-017 <br /> Page 6/Rev 171204 <br /> Protection and preservation of subgrade due to desiccation, wetting, freezing, inclement weather, or <br /> other factors is the responsibility of others, once grade is accepted by the Contractor <br /> Excludes taxes on permanent materials <br /> Excludes utility coordination, relocation, removal, and potholing. SEMA will conduct utility locates and <br /> any supplementary potholing to safely construct their own work. <br /> Excludes temporary facilities, toilets, and trash containers. <br /> Excludes adjustment of existing or new utilities, inlets, manholes, valves, or other structures to <br /> accommodate operations of other contractors. Protection and block-out of inlets and manholes in <br /> advance of pavement operations excluded. After completion of paving operations and removal of <br /> protection/block-outs, SEMA will construct/raise inlets/manholes to grade. <br /> Excludes all work not specifically listed as included as part of the quoted work scope. All work scopes <br /> per CDOT measurement and payment standards and neat line quantities based in final RFC <br /> drawings. <br /> Retention not to exceed the percentage withheld by project owner on the value of SEMA's contract <br /> amount earned. <br /> Excludes hazardous waste handling or exposure requiring special personnel protective equipment <br /> Excludes handling, testing, and disposal, treating of contaminated soils,water or other materials <br /> Excludes dust mitigation for other contractors. <br /> Includes shoring/sloping of pipe trenches and related drainage structures constructed by SEMA <br /> Excludes cut shoring of structural excavations for bridges, retaining walls/systems, and structures not <br /> constructed by SEMA. <br /> Excludes removal of any temporary shoring elements constructed by others <br /> Excludes dewatering, water diversion for work areas and work performed by General <br /> Contractor/others <br /> Excludes finish grading and/or topsoiling of fills or disturbances not constructed by SEMA. <br /> Excludes construction access for general contractor, other contractors or suppliers not affiliated with <br /> SEMA construction, except as quoted <br /> Excludes imported topsoil, soil amendments, and herbicide treatments <br /> Excludes pipe boring,jacking, and tunneling <br /> Excludes providing continuity for gravity drainage or pumped dewatering of storm drainage due to <br /> phasing conflicts that prevent normal gravity drainage conditions <br /> Excludes river or stream access or diversions and cofferdams to support construction operations by <br /> others <br /> Equal Opportunity/Affirmative Action Employer <br />
The URL can be used to link to this page
Your browser does not support the video tag.