Laserfiche WebLink
<br />x <br /> <br />STATUS: COMPLIED WITH 5/14/1993. <br /> <br />Stipulation No. 44 <br /> <br />MCC MUST REVISE WINDY GAP POLICY CALCULATIONS FOR ANNUAL NET WATER DEPLETION, COORDINATE <br />WITH THE U.S. FISH AND WILDLIFE SERVICE AND PROVIDE ALL INFORMATION TO THE DIVISION TO <br />INCORPORATE INTO THE PERMIT. AN APPLICATION FOR A TECHNICAL REVISION TO INCLUDE THE REVISED <br />INFORMATION SHOULD BE RECEIVED BY DECEMBER 31, 1992. <br /> <br />STATUS: COMPLIED WITH 2/1/1993. <br /> <br />Stipulation No. 45 <br /> <br />MCC MUST RESOLVE OUTSTANDING ISSUES FROM 1991 PERMIT RENEWAL (SEE SPECIFIC INFORMATION IN <br />THE DIVISION’S LETTER DATED DECEMBER 2, 1992). THE INFORMATION SHALL BE SUBMITTED BY <br />DECEMBER 30, 1992. <br /> <br />STATUS: COMPLIED WITH 2/2/1993. <br /> <br />Stipulation No. 46 <br /> <br />MCC MUST SUBMIT AN UPDATED SPCC PLAN TO INCLUDE IN THE PERMIT UPON APPROVAL FROM THE <br />COLORADO DEPARTMENT OF HEALTH. <br /> <br />STATUS: COMPLIED WITH 4/26/1993. <br /> <br />Stipulation No. 47 <br /> <br />MCC MUST SUBMIT REVISED MAPS AND PAGES FOR MINOR REVISION 87. <br /> <br />STATUS: COMPLIED WITH 6/21/1993. <br /> <br />Stipulation No. 48 <br /> <br />MCC MUST SUBMIT REVISED SECTION 2.05 IN THE PERMIT DOCUMENT UPON APPROVAL OF TECHNICAL <br />REVISION 64. <br /> <br />STATUS: COMPLIED WITH 9/7/1993. <br /> <br />Stipulation No. 49 <br /> <br />MCC MUST ADDRESS THE DIVISION’S ASSERTION THAT A TOPSOIL DEFICIT EXISTS FOR FINAL RECLAMATION. <br />IF THERE IS A DEFICIT, MCC MUST PROVIDE A DETAILED PLAN WHICH SPECIFIES HOW THE DEFICIT WILL BE <br />ACCOMMODATED. IF SUBSOIL IS DESIGNATED AS A SUITABLE GROWTH MEDIUM, THEN THE PERMIT SHOULD <br />BE REVISED TO SPECIFY HOW MUCH SUBSOIL WILL BE UTILIZED, WHERE IT WILL BE STORED, AND HOW IT <br />WILL BE PROTECTED. A REVISION ADDRESSING THE ABOVE SHOULD BE SUBMITTED TO THE DIVISION ON OR <br />BEFORE OCTOBER 29, 1993. <br /> <br />STATUS: COMPLIED WITH 11/19/1993. <br /> <br />Stipulation. No. 50 <br /> <br />DITCH DESIGNS ASSOCIATED WITH THE RELOCATED TOPSOIL PILE SHOULD BE PROVIDED BY OCTOBER 18, <br />1993, TO BE INCORPORATED INTO EXHIBIT 66. THE DESIGNS SHOULD REFLECT STORM EVENTS APPROVED IN <br />TECHNICAL REVISION 64 AND SHOULD BE COMPLETED IN ASSOCIATION WITH TECHNICAL REVISION 65. UNTIL <br />THAT TIME, DITCHES SHOULD BE CONSTRUCTED TO HAVE MINIMUM DESIGNS AS REQUIRED BY DITCHES D1-4