Laserfiche WebLink
<br />xi <br /> <br />AND 2-2D. <br /> <br />STATUS: COMPLIED WITH 10/1/1993. <br /> <br />Stipulation No. 51 <br /> <br />THE DIVISION 4 WATER COURT SHALL BE NOTIFIED OF THE NEW POND LOCATIONS WITHIN 45 DAYS OF <br />DMG’S PROPOSED DECISION. IN ADDITION, A DAM SAFETY REVIEW SHALL BE COMPLETED ON MB-2 AND <br />MB-3 WITHIN 45 DAYS AFTER CONSTRUCTION OF THE PONDS IS COMPLETED. (COMMENTS RECEIVED FROM <br />THE DIVISION OF WATER RESOURCES DATED SEPTEMBER 17, 1993.) <br /> <br />STATUS: COMPLIED WITH 4/3/1995. <br /> <br />Stipulation No. 52 <br /> <br />SUBMIT TYPICAL CROSS-SECTIONS, DETAILS OF DISTURBANCE THAT WILL OCCUR, AND RECLAMATION WORK <br />TO BE COMPLETED FOR THE EXPLORATION ROAD THAT WILL BE CONSTRUCTED IN LONE PINE GULCH. <br /> <br />STATUS: COMPLIED WITH 4/12/1994. <br /> <br />Stipulation No. 53 <br /> <br />ALL UNRESOLVED PERFORMANCE STANDARD ISSUES AND SUBMITTAL REQUIREMENTS SUCH AS, BUT NOT <br />LIMITED TO, GEOTECHNICAL STABILITY ISSUES, SEDIMENT CONTROL PLANS, BONDING REQUIREMENTS, AND <br />REVISED PAGE, MAP AND/OR EXHIBIT HARD COPY SUBMITTALS, SHALL BE SUBMITTED AND APPROVED BY <br />THE APPROPRIATE REVISION PROCESS PRIOR TO PROJECT INITIATION. <br /> <br />STATUS: COMPLIED WITH 8/22/1994. <br /> <br />Stipulation No. 54 <br /> <br />FOR THE REFUSE PILE EXPANSION, MCC OR ITS CONSULTANTS SHOULD EITHER (1) PREPARE A MORE <br />DESCRIPTIVE JUSTIFICATION FOR THE SELECTION OF THE MECHANICAL PROPERTIES USED IN COMPLETING THE <br />ANALYSIS OR (2) PERFORM A SENSITIVITY ANALYSIS OF THE PILE USING THE SELECTION OF COAL REFUSE <br />STRENGTH VALUES CONTAINED IN THE EARLIER LOWER REFUSE PILE STABILITY ANALYSIS. THIS <br />INFORMATION SHOULD BE SUBMITTED ON OR BEFORE FEBRUARY 17, 1995. THE DISPOSAL OF THE COAL <br />WASTE SHOULD NOT BEGIN UNTIL THE INFORMATION REQUIRED HAS BEEN REVIEWED BY THE DIVISION. <br /> <br />STATUS: COMPLIED WITH 2/16/1995. <br /> <br />Stipulation No. 55 <br /> <br />MCC MUST SUBMIT ADDITIONAL INFORMATION REGARDING A REPAIR PLAN FOR THE HAUL ROAD. A PLAN <br />VIEW OF THE SURFACE WATER DRAINAGE, CROSS SECTION OF BUTTRESS WITH REFUSE PILE AT FINAL <br />CONFIGURATION, AND ANYTHING ELSE REQUIRED AS A RESULT OF THE REVIEW OF THE DESIGN AND <br />STABILITY ANALYSIS OF THE BUTTRESS. <br /> <br />STATUS: COMPLIED WITH 8/1/1995. <br /> <br />Stipulation No. 56 <br /> <br />MCC MUST SUBMIT AN INFORMAL AGREEMENT WITH THE US FOREST SERVICE TO MONITOR PONDS. MCC <br />SHOULD PROVIDE A SIGNED COPY OF THE AGREEMENT WITH THE PAONIA RANGER DISTRICT TO INFORMALLY <br />MONITOR THE USFS SURFACE WATER RESOURCES LOCATED ABOVE PANELS TO BE RETREAT MINED OR <br />WITHIN THE ANGLE OF DRAW. THE SIGNED AGREEMENT SHALL BE PROVIDED BY MAY 31, 1995, TO BE <br />INCORPORATED INTO THE PERMIT.