Laserfiche WebLink
<br />ix <br /> <br />Stipulation No. 37 <br /> <br />MCC WILL SUBMIT REVISED PAGE 3-35 AND EXHIBIT 3.2.7.1A AND BOND CALCULATIONS FOR RECLAMATION <br />BY AUGUST 6, 1989. <br /> <br />STATUS: COMPLIED WITH 8/7/1989. <br /> <br />Stipulation No. 38 <br /> <br />MCC WILL INCORPORATE DETAILS OR A REFERENCE TO THE WEED CONTROL PLAN INTO THE PERMIT <br />APPLICATION BY SEPTEMBER 14, 1990. <br /> <br />STATUS: TERMINATED 9/26/1990. <br /> <br />Stipulation No. 39 <br /> <br />PRIOR TO THE CONSTRUCTION OF THE COAL STORAGE PAD, A PLAN MAP MUST BE SUBMITTED SHOWING THE <br />PROPOSED TOPOGRAPHY OF THE PAD. THIS MAP MUST SHOW THE LOCATION OF THE CLEAN WATER DITCHES, <br />SEDIMENT DITCHES, AND SEDIMENT TRAP AND CULVERTS. <br /> <br />STATUS: COMPLIED WITH 11/25/1991. <br /> <br />Stipulation No. 40 <br /> <br />PRIOR TO DISTURBING THE AREA OF THE STORAGE PAD, MCC MUST SUBMIT CALCULATIONS TO SHOW THAT <br />THE SEDIMENT POND RECEIVING THE RUNOFF FROM THE STORAGE PAD IS SUFFICIENTLY SIZED TO HANDLE <br />THE CALCULATED VOLUME OF WATER. <br /> <br />STATUS: COMPLIED WITH 11/25/1991. <br /> <br />Stipulation No. 41 <br /> <br />PRIOR TO THE IMPORTATION OF FILL MATERIAL TO CONSTRUCT THE COAL STACKING TUBE PAD, MCC MUST <br />SUBMIT BOND CALCULATIONS AND UPDATE THE RECLAMATION PLAN FOR THE REMOVAL OF THE FILL <br />MATERIAL. THE SOURCE OF THE FILL MATERIAL MUST BE IDENTIFIED. IF GOB IS TO BE USED, THIS MUST BE <br />PROPOSED AS A TECHNICAL REVISION AND BS SUPPORTED WITH DESIGNS THAT MEET THE DIVISION’S <br />PERFORMANCE STANDARDS FOR COAL WASTE BANKS. PLANS MUST BE CERTIFIED BY A QUALIFIED ENGINEER. <br /> <br />STATUS: COMPLIED WITH 11/25/1991. <br /> <br />Stipulation No. 42 <br /> <br />THE INFORMATION SUBMITTED WITH THE TECHNICAL REVISION AND AS PART OF THE STIPULATION <br />RESPONSES MUST BE INCORPORATED INTO THE NEW REORGANIZED PERMIT APPLICATION. STIPULATION <br />RESPONSES MUST BE SUBMITTED AS MINOR REVISIONS OR, IF GOB IS TO BE USED AS FILL, THAT PORTION MUST <br />BE SUBMITTED AS A TECHNICAL REVISION. <br /> <br />STATUS: COMPLIED WITH 2/2/1993. <br /> <br />Stipulation No. 43 <br /> <br />MCC MUST SUBMIT AS-BUILT DESIGNS FOR ALL STRUCTURES AT THE WEST ELK MINE SITE, INCLUDING BUT <br />NOT LIMITED TO: ALL SURFACE FACILITIES, DEWATERING SYSTEM, PORTAL BENCH AND PORTAL <br />STRUCTURES, WATER TREATMENT PLANT, STORAGE TANKS, AND WASTE WATER PLANT BY DECEMBER 30, <br />1992. <br />