My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-08-28_REVISION - M1983102
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1983102
>
2018-08-28_REVISION - M1983102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:15:15 PM
Creation date
8/28/2018 2:16:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983102
IBM Index Class Name
REVISION
Doc Date
8/28/2018
Doc Name
Request for Technical Revision
From
Reclamation Ridge
To
DRMS
Type & Sequence
TR3
Email Name
PSH
MAC
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Reclamation Ridge, LLC. Technical Revision 03 <br /> Thompson Resource August2l, 2018 <br /> M-1983-102 <br /> Using the November 16 , 2009 Circes Cost Estimate as a basis for <br /> the bond calculation, I propose eliminating Tasks 006 and 009 <br /> that deal with resoiling and revegetation of the floor and <br /> increasing the following volumes to allow for more disturbance <br /> area. Using the task numbers from the estimate, the proposed <br /> changes are : <br /> 001 WORKING FACE REDUCTION - no change (650 If @ 29.62 cyds/Ift) <br /> 003 GRADE CURRENT STOCKPILES - no change <br /> 004 RESHAPE PIT FLOOR - increase to 28.0 acres (current 24.2 ac) <br /> 005 REPLACE TOPSOIL ON SLOPES - increase to 2825 cyds (3.50 ac @ 6") <br /> 006 Eliminate <br /> 008 HYDROSEEDING SLOPES - increase to 5.7 acres to seed slopes and topsoil piles (2.2 ac) <br /> that would be graded. <br /> 009 Eliminate <br /> O10 MOBILIZATION - Remove Cat 631G scraper and Revegetation equipment that were to be y <br /> used on floor area. <br /> 011 2:1 SLOPE MAINTENANCE - no change <br /> All material needed for industrial area grading and working face <br /> reduction is onsite . There is an estimated 12 , 350 yds topsoil on <br /> site . Attached is a revised Exhibit L - Reclamation Costs based <br /> on these numbers . <br /> Respectfully Submitted, <br /> -�Oz <br /> �— <br /> Ken Evans, Jr. <br /> Manager <br /> PAGE 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.