My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-08-22_REVISION - M1977493A
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
2018-08-22_REVISION - M1977493A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2021 12:44:25 AM
Creation date
8/22/2018 4:39:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493A
IBM Index Class Name
REVISION
Doc Date
8/22/2018
Doc Name
Request for Technical Revision
From
Climax Molybdenum
To
DRMS
Type & Sequence
TR28
Email Name
ECS
MAC
Media Type
D
Archive
Yes
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
395
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Technical Revision (TR-28) Climax Molybdenum Company <br /> Environmental Protection Plan Permit No. M-1977-493 <br /> Since the 1989 amendment, and continuing to date, a significant number of closure and reclamation <br /> activities have occurred at the site. Portions of the Mayflower Tailing Storage Facility (TSF) and 5 Dam <br /> were capped and vegetated. Except for 5-Shaft, the underground support facilities in the Storke Yard <br /> have been dismantled and the Storke Yard area has been reclaimed. The Oxide Pond (TSF) area (Eagle <br /> Park Reservoir; aka: 4 Dam Reservoir) has been reclaimed as a fresh water storage reservoir and sold to <br /> outside interests. 1 Dam has been resloped and capped, and seeded in some areas. The Robinson TSF <br /> has been capped with a rock cover and most of the surface reclaimed using biosolids. The 2 Dam <br /> Spillway and a portion of the East Side Channel (ESC) have been constructed and are operational. <br /> Portions of the E and F Dumps have been recontoured and seeded. The E and F Dumps are located <br /> within the footprint of the overburden storage facility (OSF) now termed the North 40 OSF (TR-22). The <br /> water treatment system has been upgraded with the installation of an on-line lime slaking facility and <br /> Sludge Densification Plant (SDP), and with construction of the Property Discharge Water Treatment Plant <br /> (PDWTP). A high capacity pump station was installed at the base of 3 Dam as part of the water treatment <br /> system upgrades. Numerous historical mine sites have been remediated and reclaimed. Finally, as <br /> previously mentioned, numerous unneeded buildings and structures in the mine and mill area have been <br /> dismantled and demolished. <br /> Infrastructure upgrades and system improvement projects previously approved under TR-14 and TR-17 <br /> include the rehabilitation of Tenmile Tunnel, a new Tailing Delivery Line (TDL), the Robinson Lake Pump <br /> Station and Pipeline and the new mill building. TR-19 consisted of the Property Discharge Water <br /> Treatment Plant (PDWTP) that is part of the Climax water treatment system for stage 2 metals removal <br /> that began operating in July 2014, and TR-21 describes the Mayflower Flood Bypass Tunnel (for <br /> emergency water release) and Reclaim Water System (including a new barge and pipeline system). <br /> Major components and facilities at Climax include the open pit and underground mine, overburden <br /> storage facilities, or OSFs (McNulty and North 40) that were approved under TR-22 and TR-25, crusher <br /> and mill complex, the process water reservoir (Robinson Lake; aka: Robinson Reservoir) and its circuit, <br /> fresh water reservoirs (Chalk Mountain Reservoir and Buffehrs Lake) and their circuits, the SDP <br /> (providing stage 1 metals removal) and PDWTP (providing stage 2 metals removal), the Robinson TSF <br /> (undergoing final reclamation), Tenmile TSF (approved under TR-20, the Mayflower TSF (approved under <br /> TR-23), the clear water Interceptor System, and the Lake Irwin wetland mitigation area (approved under <br /> TR-26). Since Climax dates to 1918, some of these components or their predecessors are historic, pre- <br /> dating the Colorado Mined Land Reclamation Act by decades. <br /> Ancillary fresh water facilities not owned or managed by Climax, including Clinton Reservoir and Eagle <br /> Park Reservoir, are important site features and do interact with Climax's water management system. The <br /> East Interceptor in the Tenmile Creek Watershed feeds fresh water into Clinton Reservoir and the <br /> reservoir provides flood control to protect the Mayflower TSF. The Chalk Mountain Interceptor in the <br /> Eagle River Watershed feeds fresh water into Eagle Park Reservoir and Climax operates a seepage <br /> collection and return system from the toe of 4 Dam, the dam containing Eagle Park Reservoir. <br /> Detailed locations, descriptions, and map references of specific environmental protection facilities are in <br /> Section T-5 and in the attached appendices as referenced throughout. Figure AM-06-T-01 illustrates the <br /> locations of major components and facilities. Detailed physical and environmental descriptions of the site <br /> also are in various permitting documents submitted to DRMS including the 1977 Climax Mining and <br /> Reclamation Permit, Reclamation Permit Amendments, and Technical Revisions. <br /> T-2 Other Agency Environmental Protection Measures <br /> T-2.1 Genera/Information <br /> The Climax Mine is regulated at various levels by the DRMS, the Colorado Air Pollution Control Division <br /> (APCD), and the Colorado Water Quality Control Division (WQCD). The latter two divisions are within the <br /> Colorado Department of Public Health and Environment (CDPHE). The WQCD administers Climax's <br /> Colorado Pollutant Discharge System (CPDS) permit and a storm water permit. As part of the storm <br /> water permit, Climax maintains a Storm Water Management Plan (SWMP). The SWMP addresses the <br /> handling of water that is outside of the water treatment system at Climax. <br /> EPP: Version R4 T-5 August 2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.