My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-08-22_REVISION - M1977493A
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
2018-08-22_REVISION - M1977493A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2021 12:44:25 AM
Creation date
8/22/2018 4:39:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493A
IBM Index Class Name
REVISION
Doc Date
8/22/2018
Doc Name
Request for Technical Revision
From
Climax Molybdenum
To
DRMS
Type & Sequence
TR28
Email Name
ECS
MAC
Media Type
D
Archive
Yes
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
395
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Technical Revision (TR-28) Climax Molybdenum Company <br /> Environmental Protection Plan Permit No. M-1977-493 <br /> regulatory agencies, notification relative to changes, particularly minor ones, can rapidly become unwieldy <br /> for both Climax and the DRMS. Therefore, Climax will handle minor changes in referenced documents <br /> and information by maintaining a central Climax Environmental file system for the reclamation plan and <br /> associated EPP information and documents. Climax will conduct periodic reviews of the EPP to identify <br /> where changes have occurred and where changes may occur during subsequent years. Significant <br /> changes to EPP R3 are reflected in this EPP version R4 and submitted to DRMS as TR-28. <br /> T-1.1.3 Emergency Response Plan for Designated Chemicals <br /> An Emergency Response Plan for designated chemicals is required as a component of the EPP to <br /> comply with Sections 34-32-103 (4.9) and 34-32-116.5(5), C.R.S 1984 and Section 8.3 of the Mineral <br /> Rules and Regulations of the Colorado Mined Land Reclamation Board for Hard Rock, Metal and <br /> Designated Mining Operations (Rules). An Emergency Response Plan for Designated Chemicals at <br /> Climax is included as Appendix T-A. Climax also maintains a required Spill Prevention Control and <br /> Countermeasures (SPCC) Plan. These documents describe procedures to prevent, control, and mitigate <br /> releases of chemicals to the environment and provide supplemental information pertaining to emergency <br /> response for designated chemicals. Copies of the SPCC are kept in the Climax Environmental file <br /> system. <br /> T-1.2 Description of Site <br /> Climax is an open pit and former underground mining operation that extracts, crushes, and processes <br /> molybdenite ore from the base of Bartlett Mountain and produces concentrate at the adjacent mill site. <br /> The final product is molybdenum disulfide (MoS2) concentrate that is transported off site for final <br /> processing. <br /> The Climax mine, mill, and ancillary facilities are located near the summit of Fremont Pass (elevation <br /> 11,318 feet) where Colorado State Highway 91 crosses the Continental Divide. The mine is located <br /> approximately 12 miles south of 1-70 at Copper Mountain, Colorado and 13 miles north of Leadville, <br /> Colorado. The site is located within the headwaters of three drainages on both sides of the Continental <br /> Divide and encompasses the upper reaches of the Arkansas River, East Fork of the Eagle River, and <br /> Tenmile Creek. Acreage affected by mine and mill operations lie within a contiguous 14,300 acre land <br /> block owned by the Climax Molybdenum Company. Site maps and maps of affected acreages are <br /> located in Exhibit C of Permit Amendment Application AM-06. The Climax boundary and affected areas <br /> also are included on Figure AM-06-T-01. <br /> Climax began underground operations in 1918 and operated intermittently until the 1920s when <br /> continuous mining and milling commenced. When Climax was originally permitted under the Colorado <br /> Mined Land Reclamation Act in 1977, production from the mine was approximately 50,000 tons per day <br /> from both underground and open pit operations. The estimated mine life at that time anticipated <br /> exhaustion of ore reserves in the year 2015. However, when the world market for molybdenum declined <br /> dramatically in the early to mid-1980s, economics forced Climax to curtail mineral production and <br /> development substantially. <br /> In 1989, the reclamation permit was amended (AM-03) to better reflect the realities of long-term limited <br /> production at that time. This amendment addressed the role of Climax as a "swing producer" with limited <br /> and declining underground production and the ability to produce from the open pit in the future. <br /> Amendment AM-05 (July 2005) briefly discussed business plans for the Climax Molybdenum Company, <br /> recognized that the concept of"swing-producer" had become obsolete, and confirmed the active status of <br /> the operation. In 2007, Climax Molybdenum Company announced its intent to return Climax to <br /> production in 2010. Production would come from the open pit and processing would occur in a new, <br /> modern mill facility located adjacent to the pit. Old and obsolete infrastructure would be removed from <br /> the site. Demolition of unneeded site structures began in 2006 and continued through 2008. <br /> Climax initiated construction of new processing facilities in April 2008. In 2008, due to economic <br /> considerations, Climax temporarily slowed these construction activities associated with the restart of <br /> mineral extraction and production at Climax. Climax restarted production of MoS2 concentrate in May <br /> 2012. <br /> EPP: Version R4 T-4 August 2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.