Laserfiche WebLink
Page 4 of 16 <br />WHEEL LOADER — LOAD AND CARRY WORK <br />Task description: Topsoil salvage from TR69 <br />Site: Roadside Portals Permit Action: SL11 Permit/Job#: C1981041 <br />PROJECT IDENTIFICATION <br />Task #: 207 State: Colorado <br />Date: 8/13/2018 County: Mesa <br />User: TNL <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: CAT 914G <br />Attachment 1: ROPS Cab <br />Cost Breakdown: <br />Abbreviation: None <br />Filename: 207 <br />Horsepower: 95 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />MATERIAL QUANTITIES <br />Initial volume: 325 <br />Loose volume: 406 <br />Source of estimated volume: <br />Source of estimated swell factor: <br />CCY Swell factor: 1.250 <br />LCY <br />TR69 <br />Cat Handbook <br />HOURLY PRODUCTION <br />Loader Cycle Time: Unadjusted Basic Cycle Time (load, dump, 0.450 minutes <br />maneuver): <br />Cycle Time Factors <br />Utilization % <br />Ownership Cost/Hour: <br />$15.29 <br />NA <br />Operating Cost/Hour: <br />$21.17 <br />100 <br />Operator Cost/flour: <br />$36.13 <br />NA <br />Total Unit Cost/Hour: <br />$72.58 <br />-0.040 <br />Total Fleet Cost/Hour: <br />$72.58 <br />Constant operation -0.04 <br />-0.040 <br />MATERIAL QUANTITIES <br />Initial volume: 325 <br />Loose volume: 406 <br />Source of estimated volume: <br />Source of estimated swell factor: <br />CCY Swell factor: 1.250 <br />LCY <br />TR69 <br />Cat Handbook <br />HOURLY PRODUCTION <br />Loader Cycle Time: Unadjusted Basic Cycle Time (load, dump, 0.450 minutes <br />maneuver): <br />Cycle Time Factors <br />Factor (min.) <br />Source <br />Material: <br />Bank or broken material 0.04 <br />0.040 <br />(Cat HB) <br />Stockpile: <br />No adjustment - factor not applicable 0.00 <br />0.000 <br />(Cat HB) <br />Truck Ownership: <br />Common ownership of trucks and loaders - <br />0.04 <br />-0.040 <br />(Cat HB) <br />Operation: <br />Constant operation -0.04 <br />-0.040 <br />(Cat HB) <br />Dump Target: <br />Nominal target 0.00 <br />0.000 <br />(Cat HB) <br />Net Cycle Time Adjustment: -0.040 minutes <br />Adjusted Basic Cycle Time: 0.410 minutes <br />Rolling Resistance — Road Conditions <br />Haul: Firm, smooth, rolling, dirt/It. surfaced, watered, maintained 3.0 <br />Return: Firm, smooth, rolling, dirt/It. surfaced, watered, maintained 3.0 <br />Haul and Return Time <br />CIRCES Cost Estimating Software <br />