Laserfiche WebLink
Page 3 of 16 <br />Subtotals: $246.49 $246.49 <br />�x�l��i�u��.��art��w����r:�.c��rrlr�rr•: <br />Nearest Major City or Town within project area region: <br />Total one-way travel distance: <br />Average Travel Speed: <br />Total Non-Roadable Mob/Demob Cost * <br />`* two round trips with haul rig: <br />Total Roadable Mob/Demob Cost ** <br />** one round trip, no haul rig: <br />Transportation Cycle Time: <br />Non- <br />Roadable <br />Equipmej <br />Haul Time (Hours): 0.71 <br />Return Time (Hours): 0.71 <br />Loading Time (Hours): 0.25 <br />Unloading Time (Hours): 0.25 <br />Subtotals: 1.93 <br />JOB TIME AND COST <br />Roadable <br />Equipment <br />0.71 <br />0.71 <br />NA <br />NA <br />1.43 <br />GRAND JUNCTION <br />25.00 miles <br />35.00 mph <br />$5,017.26 <br />$352.13 <br />Total job time: 3.86 Hours <br />Total job cost: $5,369 <br />CIRCES Cost Estimating Software <br />