Laserfiche WebLink
EQUIPMENT MOBILIZATION/DEMOBILIZATION <br />Task description: Mobilize Equipment for Remaining Reclamation <br />Site: Roadside Portals Permit Action: SLI I Permit/Job#: C1981041 <br />PROJECT IDENTIFICATION <br />Task #: 205 State: Colorado <br />Date: 8/13/2018 County: Mesa <br />User: TNL <br />Agency or organization name: DRMS <br />EQUIPMENT TRANSPORT RIG COST <br />Abbreviation: None <br />Filename: 205 <br />Shift basis: 1 per day <br />Cost Data Source: CRG Data <br />Truck Tractor Description: GENERIC ON -HIGHWAY TRUCK TRACTOR, 6X4, DIESEL POWERED, <br />400 HP (2ND HALF, 2006) <br />Truck Trailer Description: GENERIC FOLDING GOOSENECK, DROP DECK EQUIPMENT <br />TRAILER (25T, 50T, AND 100T) <br />Cost Breakdown: <br />Available Rig Capacities 0-25 Tons <br />26-50 Tons <br />51+ Tons <br />Ownership Cost/Hour: $16.63 <br />$18.37 <br />$22.33 <br />Operating Cost/Hour: $44.38 <br />$46.13 <br />$50.07 <br />Operator Cost/Hour: $27.66 <br />$27.66 <br />$27.66 <br />Helper Cost/Hour: $0.00 <br />$25.39 <br />$25.39 <br />Total Unit Cost/Hour: $88.67 <br />$117.55 <br />$125.45 <br />NON ROADABLE EQUIPMENT: <br />Machine <br />Weight/ <br />Owner ship <br />Haul Rig <br />Fleet <br />Haul Trip <br />Return Trip <br />DOT Permit <br />Description <br />Unit <br />Cost/hr/ unit <br />Cost/hr/unit <br />Size <br />Cost/hr/ <br />Cost/hr/ fleet <br />Cost/ fleet <br />$45.37 <br />(TONS) <br />$45.37 <br />$45.37 <br />Light Duty Pickup, 4x4, 1 T. <br />Crew <br />fleet <br />1 <br />$19.39 <br />Drill/Broadcast <br />25.00 <br />$15.54 <br />$88.67 <br />1 <br />$104.21 <br />$88.67 <br />$250.00 <br />Seeder with <br />Tractor <br />CAT 14M <br />23.57 <br />$60.13 <br />$88.67 <br />1 <br />$148.80 <br />$88.67 <br />$250.00 <br />Cat 324D L 9'-8" <br />27.33 <br />$42.29 <br />$117.55 <br />1 <br />$159.84 <br />$117.55 <br />$250.00 <br />Stick <br />CAT 914G <br />8.15 <br />$15.29 <br />$88.67 <br />1 <br />$103.96 <br />$88.67 <br />$250.00 <br />CAT 825H <br />36.08 <br />$107.39 <br />$117.55 <br />1 <br />$224.94 <br />$117.55 <br />$250.00 <br />Subtotals: $741.75 $501.11 1 $1,250.00 <br />ROADABLE EQUIPMENT: <br />Machine Description <br />Total Cost/hr/ <br />unit <br />Fleet Size <br />Haul Trip <br />Cost/hr/ fleet <br />Return Trip <br />Cost/hr/ fleet <br />Fuel Tanker, 6x4, 210 HP <br />$38.41 <br />1 <br />$38.41 <br />$38.41 <br />Lube Truck, 6x4, 250 HP <br />$42.32 <br />1 <br />$42.32 <br />$42.32 <br />Flatbed Truck, 6x4, 45K GVW <br />$45.37 <br />1 <br />$45.37 <br />$45.37 <br />Light Duty Pickup, 4x4, 1 T. <br />Crew <br />$19.39 <br />1 <br />$19.39 <br />$19.39 <br />Water Tanker, 5,000 Gal. <br />$101.00 <br />1 <br />$101.00 <br />$101.00 <br />