Laserfiche WebLink
Task description: <br />Site: Roadside Portals <br />PROJECT IDENTIFICATION <br />COST SUMMARY WORK <br />Permit Action: SL 11 <br />Task #: 000 State: Colorado <br />Date: 8/10/2018 County: Mesa <br />User: TNL <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Permit/Job#: C1981041 <br />Abbreviation: None <br />Filename: C041-000 <br />Task <br />Form <br />Description Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />205 <br />207 <br />208 <br />209 <br />213 <br />214 <br />215 <br />216 <br />217 <br />218 <br />Mobilize Equipment for Remaining Reclamation MOBILIZE <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />3.85 <br />$5,369.00 <br />$206.00 <br />$40.00 <br />$9,422.40 <br />$1,417.00 <br />$127.00 <br />$38.00 <br />$1,556.00 <br />$567.00 <br />$2,222.00 <br />Topsoil salvage from TR69 LOADER <br />2.83 <br />TR69 Topsoil salvage GRADER <br />0.24 <br />excavate and backfill TR69 air shaft repair SITEMAINT <br />ENANCE <br />48.00 <br />TR69 Compacting fill in excavated hole COMPACT <br />6.46 <br />TR69 replace topsoil LOADER <br />1.74 <br />TR69 Topsoil replacement GRADER <br />0.24 <br />TR69 Install concrete seal in excavated hole MINESEAL <br />8.00 <br />Seed TR69 0.4 acre disturbance REVEGE <br />3.40 <br />water truck for TR69 activity MISCTRUK <br />22.00 <br />SUBTOTALS: <br />96.76 <br />$20,964 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />2.02 <br />Total = <br />$423.47 <br />Performance bond: <br />1.05 <br />Total = <br />$220.12 <br />Job superintendent: <br />46.45 <br />Total = <br />$3,393.17 <br />Profit: <br />10.00 <br />Total = <br />$2,096.40 <br />$10,640.83 <br />TOTAL O & P = <br />$6,133.16 <br />CONTRACT AMOUNT (direct + O & P) = <br />$27,097.16 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />500.00 Total = <br />500.00 <br />Engineering work and/or contractibid preparation: <br />8.59 Total = <br />$2,327.65 <br />Reclamation management and/or administration: <br />6.20 <br />$1,680.02 <br />CONTINGENCY: <br />0.00 Total = <br />$0.00 <br />TOTAL INDIRECT COST = <br />$10,640.83 <br />TOTAL BOND AMOUNT (direct + indirect) = <br />$31,604.83 <br />