My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-08-20_REVISION - C1981041
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981041
>
2018-08-20_REVISION - C1981041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2018 7:18:32 AM
Creation date
8/22/2018 10:49:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Revision
Doc Date
8/20/2018
Doc Name
Cost Estimate
From
Tabetha Lynch
To
Clayton Wein
Type & Sequence
SL11
Inspection Date
8/20/2018
Email Name
TNL
CCW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 5 of 16 <br />Total Travel Time: 0.1692 minutes <br />Total Cycle Time: 0.5792 minutes <br />Load Bucket Canaci <br />Rated Capacity: 1.80 LCY (heaped) <br />Bucket Fill Factor: 0.975 Loose material - mixed moist aggregates (95-100%) 0.975 <br />Adjusted Capacity: 1.76 LCY <br />Job Condition Correction Factors <br />Site Altitude: 5100 feet <br />Source <br />Altitude Adj: 0.95 (CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.79 multiplier <br />Unadjusted Hourly Unit Production: <br />Adjusted Hourly Unit Production: <br />Adjusted Hourly Fleet Production: <br />JOB TIME AND COST <br />Fleet size: 1 <br />Loader(s) <br />Unit cost: $0.506 /LCY <br />181.82 <br />143.36 <br />143.36 <br />Total job time: <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />2.83 Hours <br />Total job cost: $206 <br />CIRCES Cost Estimating Software <br />Length <br />Grade Res. Rolling Total Res. Travel Time <br />(feet) <br />(%) Res. (%) (%) (minutes) <br />Source <br />Haul Route: <br />150 <br />3.00 3.00 6.00 0.1164 <br />(Cat HB) <br />Return Route: <br />150 <br />-3.00 3.00 0.00 0.0527 <br />(Cat HB) <br />Total Travel Time: 0.1692 minutes <br />Total Cycle Time: 0.5792 minutes <br />Load Bucket Canaci <br />Rated Capacity: 1.80 LCY (heaped) <br />Bucket Fill Factor: 0.975 Loose material - mixed moist aggregates (95-100%) 0.975 <br />Adjusted Capacity: 1.76 LCY <br />Job Condition Correction Factors <br />Site Altitude: 5100 feet <br />Source <br />Altitude Adj: 0.95 (CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.79 multiplier <br />Unadjusted Hourly Unit Production: <br />Adjusted Hourly Unit Production: <br />Adjusted Hourly Fleet Production: <br />JOB TIME AND COST <br />Fleet size: 1 <br />Loader(s) <br />Unit cost: $0.506 /LCY <br />181.82 <br />143.36 <br />143.36 <br />Total job time: <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />2.83 Hours <br />Total job cost: $206 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.