Laserfiche WebLink
EXHIBIT L RECLAMATION COSTS (cont) <br /> grows . So when mining reaches the point shown on Map Exhibit F-2 <br /> the site will be over bonded. <br /> This cost estimate contains costs for recoiling and <br /> revegetation for new lake shore area but none for the Plant Site <br /> area that will be left as graveled industrial area . There is <br /> adequate gravel material on site to grade the plant site without <br /> importing it . Our cost estimate to do all of the working face <br /> reshaping is based on using a 345C Cat track-hoe for sloping. A <br /> 140G motor grader to do final grading and shaping on the indus- <br /> trial area and seed beds . A Cat 988 loader will be used to haul <br /> and rough spread the growth medium, and load trucks with rubble <br /> and scrap equipment for disposal . The actual equipment used by <br /> the permittee may differ. The mobilization number is for a round <br /> trip from the Rocky Ford area (2 miles one way) . <br /> Description Units <br /> Grading & Shaping 12 .32 acres <br /> Recoiling and Seeding 0 . 50 acres <br /> Face length 350 ft. <br /> Cut/fill volume mine face 5.76 cy/lft <br /> scrap removal 150 yards <br /> concrete rubble 300 yards <br /> . growth medium (6 " deep)— 410 yards <br /> 62a (revised 8/10/2018) <br />