Laserfiche WebLink
Cost Summary Worksheet Cont’d Task # 000 Page 4 of 6 <br /> <br />CIRCES Cost Estimating Software <br />098 Regrade Access Roads; TRO Coal Quality <br />Coreholes 5-10, MR272 <br />DOZER 1 19.44 $3,876.00 <br />099 Regrade Light-Use Road; 5MN Borehole MR283 DOZER 1 6.96 $1,687.00 <br />100 Rip New CRDA Topsoil Stockpile Access Road; <br />MR290 <br />RIPPER 1 0.82 $203.00 <br />100a Regrade 13LT Outby Utility Borehole Road Area; <br />MR291 <br />DOZER 2 7.74 $3,108.00 <br />100b Rip and Regrade 9 East Utility Borehole Road <br />(MR296) <br />DOZER 2 3.03 $1,780.00 <br />101 Regrade Ditch D-3 DOZER 1 29.24 $2,291.00 <br />102 Regrade Ditch E-1 DOZER 1 12.63 $989.00 <br />103 Regrade Ditch F-1 and Pond F Ditches DOZER 1 21.26 $1,665.00 <br />105 Regrade Ditch G-4 DOZER 1 19.27 $1,509.00 <br />106 Regrade West Rail Loop Diversion Ditch DOZER 1 2.15 $169.00 <br />110 Backfill and Regrade Pond B DOZER 1 7.61 $2,094.00 <br />111 Backfill and Regrade Pond C DOZER 1 19.94 $5,490.00 <br />112 Backfill and Regrade Pond D DOZER 1 22.43 $6,176.00 <br />113 Backfill and Regrade Pond E DOZER 1 17.45 $4,803.00 <br />114 Backfill and Regrade Pond F DOZER 1 27.57 $7,591.00 <br />115 Backfill and Regrade Pond G DOZER 1 34.46 $9,488.00 <br />116 Backfill and Regrade Pond T DOZER 1 2.44 $672.00 <br />117 Backfill and Regrade 6 North Main Holding Pond <br />Embankments, <br />DOZER 1 35.97 $9,904.00 <br />118 Backfill and Regrade 18 Left Vent Shaft Ponds DOZER 1 8.10 $2,231.00 <br />130 Replace Topsoil at Portal Surface Area SCRAPER1 2 38.43 $69,745.00 <br />131 Replace Topsoil at Office/Bathouse SCRAPER1 2 39.54 $71,757.00 <br />132 Replace Topsoil at Parking Lot and Laydown Area SCRAPER1 2 51.83 $94,067.00 <br />133 Replace Topsoil at Stoker Coal Loading Area SCRAPER1 1 1.29 $1,463.00 <br />134 Replace Topsoil at Refuse Area, Refuse Area <br />Expansion Phase <br />SCRAPER1 3 203.00 $552,035.00 <br />135 Replace Topsoil on Haulroad B SCRAPER1 1 62.69 $84,606.00 <br />136 Replace Topsoil on Fish Creek Borehole Area and <br />Road <br />SCRAPER1 1 9.72 $13,119.00 <br />137 Replace Topsoil on Explosives Storage Area SCRAPER1 1 4.54 $5,124.00 <br />138 Replace Topsoil on Truck Loadout and Haulroad C SCRAPER1 1 55.72 $62,958.00 <br />139 Replace Topsoil on Pond E and Haulroad B SCRAPER1 1 4.00 $4,514.00 <br />140 Replace Topsoil on Pond E Relocation Area SCRAPER1 1 9.45 $10,681.00 <br />141 Replace Topsoil on Batch /Weigh Loadout <br />Stockpile Area <br />SCRAPER1 1 3.91 $4,418.00 <br />142 Replace Topsoil on 18 Right West Portion Access <br />Road <br />SCRAPER1 1 3.23 $3,099.00 <br />143 Replace Topsoil on 18 Right East Central Portion <br />Access Road <br />SCRAPER1 1 2.03 $1,947.00 <br />144 Replace Topsoil on 18 Right Northeast Portion <br />Access Road <br />SCRAPER1 1 0.60 $574.00 <br />145 Replace Topsoil on West Haulroad SCRAPER1 1 0.63 $601.00 <br />146 Replace Cover Material on Refuse Disposal Area SCRAPER1 3 154.21 $419,369.00 <br />147 Replace Topsoil on Main Facilities <br />Access/Haulroad Area <br />SCRAPER1 1 7.00 $9,450.00 <br />148 Haul and Replace Topsoil to Fish Creek Tipple TRUCK1 1 31.01 $35,485.00 <br />149 Haul and Replace Topsoil to "Trudy's Corner" <br />Laydown Area <br />TRUCK1 1 12.46 $14,258.00 <br />150 Replace Topsoil on 10 Right Dewatering Borehole DOZER 1 14.35 $2,053.00 <br />151 Replace Topsoil on Eastern Mining District Vent <br />Shaft Area <br />DOZER 1 95.34 $13,639.00