My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-08-09_REVISION - C1982056
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982056
>
2018-08-09_REVISION - C1982056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2018 6:53:51 AM
Creation date
8/10/2018 5:53:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Revision
Doc Date
8/9/2018
Doc Name Note
Cost Estimate
Doc Name
Cost Estimate
From
DRMS
To
Jerry Nettleton
Type & Sequence
RN7
Email Name
TNL
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cost Summary Worksheet Cont’d Task # 000 Page 5 of 6 <br /> <br />CIRCES Cost Estimating Software <br />153 Replace Topsoil on 6 North Main Vent Shaft Pad <br />and Access Ro <br />DOZER 1 58.42 $8,358.00 <br />154 Replace Topsoil on 16 Left Pad and Access Road DOZER 1 8.15 $1,166.00 <br />155 Replace Topsoil on Explorati Drill Pads for Holes <br />TWC001-007 <br />DOZER 1 4.61 $659.00 <br />156 Replace Topsoil on 15 Left Pad and Access Road DOZER 1 9.52 $1,552.00 <br />157 Replace Topsoil on 16LT Pad and Access Road DOZER 1 76.26 $14,629.00 <br />158 Replace Topsoil on 6 North Main Reservoir <br />Disturbances <br />DOZER 1 113.80 $21,831.00 <br />159 Replace Topsoil on Northwest Mains Ve nt Pad DOZER 1 7.51 $1,440.00 <br />160 Replace Topsoil on Explorati Drill Pads for Holes <br />TCW008-012 <br />DOZER 1 2.41 $461.00 <br />161 Replace Topsoil on Thickener Underflow Borehole <br />Area <br />DOZER 1 4.25 $815.00 <br />162 Replace Topsoil on Refuse Clay Pile Staging Area <br />OSP-1 <br />DOZER 1 15.99 $3,068.00 <br />163 Replace Topsoil on 19 Right Pad and Pipeline <br />Corridor <br />DOZER 1 24.21 $4,644.00 <br />164 Replace Topsoil on 18 Left Pipeline Corridor DOZER 1 24.11 $4,626.00 <br />165 Replace Topsoil on 18 Left Pad and Access Road DOZER 1 44.22 $8,483.00 <br />166 Replace Topsoil on 18 Right Pad LOADER 1 15.82 $1,918.00 <br />167 Replace Topsoil, DrillPad/MudPit; EMD Water <br />Mon. Wells M267 <br />DOZER 1 0.98 $195.00 <br />168 Replace Topsoil on Access Roads; EMD Water <br />Mon. Wells MR267 <br />DOZER 1 1.42 $284.00 <br />169 Replace Topsoil, Roads/Pads; TRO Coal Qual. <br />Coreholes MR269 <br />DOZER 1 2.89 $575.00 <br />171 Topsoil Drill Pads/Access Roads TRO Coal Q. <br />Coreholes 5-10 <br />DOZER 1 12.54 $2,501.00 <br />172 Topsoil Drill Pads/Acccess Road; WCR Coreholes <br />MR275 <br />DOZER 1 2.41 $480.00 <br />173 Replace Topsoil on Drill Pads and Acccess Road DOZER 1 23.54 $4,694.00 <br />174 Topsoil Drill Pad/Additional Dist. WCR Sup. <br />Coreholes MR277 <br />DOZER 1 42.00 $8,374.00 <br />175 Topsoil Drill Pads/Access Road; WCR Sup. <br />Coreholes MR278 <br />DOZER 1 16.05 $3,200.00 <br />176 Topsoil Drill Pads/Access Road; WCR Offset <br />Drilling; MR280 <br />DOZER 1 43.61 $8,694.00 <br />177 Topsoil from Stockpile to Drill Pad; 5MN <br />Borehole MR283 <br />DOZER 1 1.66 $402.00 <br />178 Topsoil from Stockpile to Light-Use Road; 5MN <br />Borehole MR283 <br />DOZER 1 2.32 $562.00 <br />179 Topsoil on Drill Pad; 10 East Mid Panel BH; <br />MR289 <br />DOZER 1 6.33 $1,263.00 <br />180 Replace Topsoil on New CRDA Access Road; <br />MR290 <br />DOZER 1 3.25 $782.00 <br />180a Replace Topsoil on 13LT Utility Borehole Pad and <br />Road; MR291 <br />SCRAPER1 1 8.41 $7,125.00 <br />180b Topsoil replacement, geotechnical test-pits, <br />MR295 <br />EXCAVATE 1 2.66 $178.00 <br />180c Replace Topsoil on 9E Borehole Pad and Road <br />(MR296) <br />DOZER 2 7.38 $4,286.00 <br />180d Regrade Drill Pads, Mud Pits, Road, and Pipeline <br />Corridor <br />DOZER 1 19.50 $3,887.00 <br />180e TR88 Replace Topsoil onBorehole Pad, Rd, and <br />Pipeline Corrid <br />DOZER 1 4.14 $826.00
The URL can be used to link to this page
Your browser does not support the video tag.