Laserfiche WebLink
Cost Summary Worksheet Cont’d Task # 000 Page 2 of 6 <br /> <br />CIRCES Cost Estimating Software <br />031 Regrade 15LT Vent Shaft Pad DOZER 1 6.27 $1,821.00 <br />032 Regrade 16LT Pad DOZER 1 8.62 $2,504.00 <br />033 Regrade 0.6 Acres Associated with Underflow <br />Pipelines <br />GRADER 1 0.17 $23.00 <br />034 Regrade Stockpile Footprint, Ditches, and Fuel Pad GRADER 1 0.88 $116.00 <br />035 Regrade 19 RT Pipeline Corridor GRADER 1 2.12 $278.00 <br />036 Regrade 18 LT Pipeline Corridor GRADER 1 2.22 $290.00 <br />037 Push Low Quality Coal into Pit DOZER 2 560.05 $308,369.00 <br />038 Push 6 North Main Cuttings into Shaft DOZER 1 28.45 $8,266.00 <br />039 Backfill 18 LT Vent Shaft Cuttings Pit DOZER 1 42.13 $12,205.00 <br />040 Remove Spoil Material from Coal Handling <br />Facility Area <br />SCRAPER1 1 41.03 $46,357.00 <br />041 Haul ROM Stockpile Footprint to Refuse Pile SCRAPER1 2 24.99 $52,235.00 <br />042 Haul Batch Weigh Stockpile Footprint to Refuse <br />Pile <br />SCRAPER1 1 7.53 $8,510.00 <br />043 Haul Remaining Stoker Coal to Refuse Pile SCRAPER1 1 14.10 $19,819.00 <br />044 Haul Belt-Out-Back Footprint to Refuse Pile SCRAPER1 2 47.76 $99,824.00 <br />045 Haul Fill from South of Portals to Train Load Out <br />Area <br />SCRAPER1 1 31.20 $43,843.00 <br />046 Haul Clay Material to Refuse Disposal Area for <br />Cover <br />SCRAPER1 2 34.03 $65,356.00 <br />048 Spread Temporary Storage Refuse Material DOZER 2 42.09 $24,387.00 <br />049 Backfill and Regrade Mud Pits for EMD Water <br />Monitoring Wells <br />DOZER 1 2.06 $410.00 <br />050 Backfill and Regrade Access Roads EMD Water <br />Monitoring Well <br />DOZER 1 4.92 $982.00 <br />051 Regrade Roads and Pads for the TRO Coal Quality <br />Coreholes <br />DOZER 1 5.83 $1,162.00 <br />052 Regrade D. Pad/Mud Pits/PipelineCorr.; 7RT <br />Thickener BH/Pipe <br />DOZER 1 11.15 $2,223.00 <br />053 Load/Haul Road Base from Monitoring Hole <br />Access Road MR271 <br />TRUCK1 1 2.93 $1,037.00 <br />054 Regrade Drill Pads/Mud Pits; TRO Coal Quality <br />Coreholes 5-10 <br />DOZER 1 5.73 $1,143.00 <br />055 Remove Employee Coal Stockpile to Refuse Pile; <br />MR274 <br />TRUCK1 1 2.20 $466.00 <br />056 Grade DrillPads/MudPits/12,250' Access Rd WCR <br />Corehole MR275 <br />DOZER 1 48.88 $9,745.00 <br />057 Regrade DrillPads/MudPits; WCR Sup. Coreholes <br />MR276 <br />DOZER 1 5.73 $1,143.00 <br />058 Regrade Add. Dist. of DrillPads/MudPits; WCR <br />Coreholes MR277 <br />DOZER 1 87.21 $17,387.00 <br />059 Grade DrillPads/MudPits; WCR Sup. Coreholes <br />MR278 <br />DOZER 1 15.55 $3,101.00 <br />060 Regrade Access Roads; WCR Sup. Coreholes <br />MR278 <br />DOZER 1 17.77 $3,544.00 <br />061 Regrade Drill Pads and Mud Pits; WCR Offset <br />Drilling MR280 <br />DOZER 1 79.15 $15,781.00 <br />062 Regrade Access Roads; WCR Offset Drilling; <br />MR280 <br />DOZER 1 11.39 $2,270.00 <br />063 Regrade Drill Pad; 5MN Cement BH MR283 DOZER 1 3.98 $964.00 <br />064 Regrade Riser Area; 5MN Pipeline MR288 GRADER 1 0.61 $54.00 <br />065 Regrade Drill Pad/Mud Pit; 10 East-Mid Pan. <br />Emergency MR289 <br />DOZER 1 6.64 $1,325.00 <br />066 Grade New CRDA Topsoil Pile Area and Access <br />Road; MR290 <br />GRADER 1 1.04 $167.00