My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-08-09_REVISION - C1982056
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982056
>
2018-08-09_REVISION - C1982056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2018 6:53:51 AM
Creation date
8/10/2018 5:53:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Revision
Doc Date
8/9/2018
Doc Name Note
Cost Estimate
Doc Name
Cost Estimate
From
DRMS
To
Jerry Nettleton
Type & Sequence
RN7
Email Name
TNL
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />COST SUMMARY WORK <br /> <br />Task description: Summary of Tasks Under Permit Renewal No. 7 <br />Site: Foidel Creek Mine Permit Action: RN7 Permit/Job#: C1982056 <br /> <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado Abbreviation: None <br />Date: 1/10/2018 County: Routt Filename: C056-000 <br />User: TNL <br />Agency or organization name: DRMS <br /> <br />TASK LIST (DIRECT COSTS) <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br /> <br />Cost <br />001 Backfill and Regrade Portal/Office Area DOZER 3 476.40 $393,466.00 <br />002 Regrade Shop/Warehouse/Parking/Stoker Areas DOZER 1 118.37 $32,589.00 <br />003 Regrade and Rip Waste Rock Pad and Adjacent <br />Areas <br />DOZER 1 149.96 $44,680.00 <br />004 Regrade and Rip Tipple, Stockpile Pads and <br />Substation Areas <br />DOZER 1 176.77 $52,669.00 <br />005 Regrade and Rip Explosives Bunker and Storage <br />Area <br />DOZER 1 9.54 $2,842.00 <br />006 Regrade and Rip Rail Loop Corridor DOZER 1 12.09 $3,601.00 <br />007 Regrade and Rip East Mine Area PM Bay, <br />Laydown Area <br />DOZER 1 40.62 $12,103.00 <br />008 Regrade and Rip "Brown Palace" Office Area DOZER 1 4.77 $1,420.00 <br />009 Regrade and Rip Training Center Area DOZER 1 4.99 $1,486.00 <br />010 Regrade, Spread Gravel Pad and Rip Rock Dust <br />Tank Area <br />DOZER 1 0.91 $271.00 <br />012 Regrade and Rip Fish Creek Borehole Area and <br />Treatment Ponds <br />DOZER 1 44.61 $13,291.00 <br />013 Regrade Batch/Weigh/Loadout System DOZER 1 79.36 $21,848.00 <br />014 Regrade 10RT Pad DOZER 1 9.29 $2,559.00 <br />016 Regrade and Rip 6 North Main Pad DOZER 1 8.24 $2,398.00 <br />018 Backfill and Regrade West Haulroad Truck Scale <br />Foundation an <br />DOZER 1 0.48 $133.00 <br />019 Backfill and Regrade Truck Loadout and Tunnel DOZER 1 7.42 $2,042.00 <br />020 Backfill and Regrade Wash Plant II Area DOZER 2 16.48 $9,578.00 <br />021 Regrade 18 Left Pad and Road DOZER 1 20.52 $5,961.00 <br />022 Regrade 6 North Main Pipeline Corridor, Road <br />Corridor, and D <br />DOZER 1 11.07 $3,217.00 <br />023 Regrade 6 Right Thickener Underflow Pad, Road, <br />and Corridor <br />DOZER 1 13.17 $3,828.00 <br />024 Regrade 18 Left Trench Increments DOZER 1 0.18 $48.00 <br />025 Regrade 19 Right Pad and Ditch Increments DOZER 1 1.15 $318.00 <br />026 Regrade 16L Grout Borehole Pad and Access Road DOZER 1 10.55 $3,066.00 <br />027 Regrade Drill Pads an Mud Pits Exploration Holes <br />TWC001-007 <br />DOZER 1 2.57 $747.00 <br />028 Regrade 6 North Main Pipeline Corridor and Relief <br />Drain <br />DOZER 1 1.21 $352.00 <br />029 Regrade Additional 16LT Road Disturbance DOZER 1 6.94 $2,011.00 <br />030 Regrade Drill Pad and Mudpits for Exploration <br />Holes TCW008-0 <br />DOZER 1 1.91 $555.00
The URL can be used to link to this page
Your browser does not support the video tag.