Laserfiche WebLink
2018 Arnold Pit 112 <br /> take app 3 weeks, the processing app 1 `/2 months and the hauling app 2 <br /> months. <br /> f. <br /> i. Nature, depth and thickness of deposits to be mined and type of overburden <br /> —nature of the product is rock to be processed into road base, depth varies <br /> from appr. 6"to appr. 20', overburden thickness varies from appr. 6" to <br /> appr. 5". The type of overburden to be removed is a rock and dirt mix. <br /> ii. Nature of the stratum immediately beneath—nature of stratum appears to be <br /> sand. <br /> g. Primary and secondary commodities—primary commodity is road base; intended <br /> use: road base for County Roads. Secondary product, if encountered, is big rock; <br /> intended use: may be used for rip rap and other County Road right of way repairs. <br /> h. Name and describe all incidental products—no incidental products are expected. <br /> i. Specify if explosives will be used—explosives will not be used. <br /> 6.4.5 EXHIBIT E — Reclamation Plan <br /> 1. see below <br /> 2. <br /> a. type of reclamation—type will be placing prior excavated materials onto <br /> excavated sites followed by the placement of topsoil, then seeding. Chosen <br /> because it's the most feasible. <br /> b. the pit will be reclaimed to a rangeland use, the same as the other land <br /> uses in the vicinity <br /> c. description of how the Reclamation Plan will be implemented— <br /> i. 3.1.1 (1) The affected lands will be reclaimed as rangeland. <br /> ii. 3.1.2 not applicable. <br /> iii. 3.1.3 will comply. <br /> iv. 3.1.4 not applicable. <br /> v. 3.1.5 Reclamation Measures—Materials Handling <br /> 1. final slopes will not be steeper than 3:1. <br /> 2. will comply. <br /> 3. will comply. <br /> 4. will comply. <br /> 5. no refuse and acid forming or toxic materials should be <br /> mined <br /> 6. no drill or auger holes should be used <br /> 7. finished slopes will be no steeper than 3:1 except in areas <br /> where no mining activities will take place (naturally <br /> existing slopes). <br /> 8. finished use is rangeland. <br /> 9. no structural materials will be used to backfill <br /> 10. will comply. <br /> 11. will comply. <br /> vi. 3.1.6 Water—General Requirements <br /> 1. will comply. <br /> Arnold Pa Pave of23 <br />