My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-07-18_PERMIT FILE - M2018019
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2018019
>
2018-07-18_PERMIT FILE - M2018019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2021 8:18:25 AM
Creation date
7/18/2018 4:01:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2018019
IBM Index Class Name
PERMIT FILE
Doc Date
7/18/2018
Doc Name
Adequacy Review Response
From
Las Animas County Road & Bridge
To
DRMS
Email Name
JLE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2018 Arnold Pit 112 <br /> f. water information—this operation is not expected to directly affect surface or <br /> groundwater systems. <br /> g. owner of structures and types— There are no structures within 200'. <br /> h. soils information— see Exhibit C- Pre-mining and Mining Plan Map 3 of 4 Soils. <br /> i. aerial photo— see Exhibit C- Pre-mining and Mining Plan Map 4 of 4 Aerial. <br /> 6.4.4 EXHIBIT D—Mining Plan <br /> a. Method of mining— Mining will commence in 2018. A dozer, loader and/or <br /> trucks will be used to push, load and haul topsoil to the topsoil stockpile. Depth of <br /> the topsoil ranges from 1-12 inches. 1-12 inches of topsoil will be removed and <br /> segregated. This stockpile will be kept safe from damage and contamination from <br /> mining activities by isolating it away from these activities. After the topsoil is <br /> relocated, the dozer and loader will commence to excavate material (pit run). The <br /> loader will dump the pit run into the hopper that feeds the crusher or screen, <br /> dumping onto the flat belt(s) that dump(s) into trucks or onto a stacking conveyor <br /> that dumps the processed material on to the processed material stockpile. A <br /> contractor may process this pit run in a similar manner. <br /> b. Earthmoving— earth moving will commence in the southern portion of the pit, <br /> moving northerly. <br /> c. Water diversions and impoundments—water diversions and impoundments will <br /> be constructed only to prevent storm water runoff. The size of the diversion/berm <br /> will be approximately 1- 1 1/2 feet in height, a typical motor grader moldboard's <br /> height. The location of the diversion/berm will be approximately 5 feet inside the <br /> permit boundary where existing slopes allow, further inside if necessary. Storm <br /> water will be allowed to evaporate naturally or will be filtered prior to exiting the <br /> site. <br /> d. Size of area to be worked at any one time—app. 39 acres. <br /> e. Appr. time table to describe the mining operation—if everything goes as planned, <br /> we'll commence earthmoving, in the southern portion of this pit, in 2018 followed <br /> shortly by processing the material. We'll reclaim excavated sites, if area and <br /> sequences allow, as we excavate different areas using the most recent excavated <br /> materials to reclaim previously excavated areas. <br /> i. Estimated time for each stage—the entire excavation of the site should take <br /> appr. 20 years from the day of commencement. The reclamation should start <br /> within 4,1 year of the ceasing of mining activities and should be completed <br /> within 5 years. <br /> ii. Description of size and location—we're anticipating the size to be app. 39 <br /> acres and the location to be the same during this phase of excavation. <br /> iii. Sequence of each stage or phase—The stripping of the topsoil phase will <br /> commence prior to crews and/or contractor(s) starting the processing phase. <br /> Once enough material is processed,the hauling of processed material from <br /> the site will commence and be placed on surrounding County roads. We're <br /> anticipating the stripping phase will commence in 2018. Estimated time for <br /> each phase will depend on material demand but the stripping phase should <br /> Arnold Pit Page'_of 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.