Laserfiche WebLink
2018 Arnold Pit 112 <br /> 2. will comply. <br /> 3. will comply. <br /> vii. 3.1.7 Groundwater— Specific Requirements <br /> 1. this operation is not expected to directly affect groundwater <br /> systems. <br /> 2. 2-9 noted. <br /> viii. 3.1.8 Wildlife <br /> 1. see Exhibit 3.1.8 Parks and Wildlife pgs 1 and 2; letters <br /> from Colorado Parks and Wildlife <br /> 2. see Exhibit 3.1.8 Parks and Wildlife pgs 1 and 2; letters <br /> from Colorado Parks and Wildlife <br /> ix. 3.1.9 Topsoiling <br /> 1. Will comply. <br /> 2. 2-8 will be followed as needed <br /> x. 3.1.10 Revegetation <br /> 1. 1-9 will be followed as they pertain to rangeland <br /> reclamation. <br /> xi. 3.1.11 Building and Structures <br /> 1. noted <br /> xii. 3.1.12 Signs and Markers <br /> 1. Will comply. <br /> xiii. 3.1.13 Spill Reporting <br /> 1. will comply, spills will be reported as required. <br /> d. Revegetation etc—revegation will be a dryland seed mix. revegetation will <br /> consist of reseeding the reclaimed areas using the following dryland seed <br /> mix: 25% annual ryegrass, 25% forage perennial ryegrass, 25% tall <br /> fescue, 10% smooth brome, 10% orchardgrass, 5%pubescent wheatgrass. <br /> The seed will be broadcast at a rate of 30-35 lbs. per acre. <br /> e. Reclamation implementation <br /> i. Estimated time for each stage—the entire excavation of the site <br /> should take appr. 20 years from the day of commencement. The <br /> reclamation should start within A 1 year of the ceasing of mining <br /> activities and should be completed within 5 years. We're <br /> anticipating the stripping phase will commence in 2018. Estimated <br /> time for each phase will depend on material demand but the <br /> stripping phase should take app 3 weeks, the processing app 1 '/z <br /> months and the hauling app 2 months. <br /> ii. Description of size and location of area to be reclaimed— <br /> description of size is the areas that have been mined and are <br /> located such that once reclaimed, there is minimal chance that <br /> mining operations will have an adverse effect on the reclaimed <br /> areas. <br /> iii. Outline of sequence of reclamation stages—we'll place the top soil <br /> on the surface to be reclaimed. Once weather and climate <br /> At nold Pit Page 4 of'_3 <br />