My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-07-09_GENERAL DOCUMENTS - C1981019
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981019
>
2018-07-09_GENERAL DOCUMENTS - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2018 12:42:39 PM
Creation date
7/9/2018 12:41:41 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
General Documents
Doc Date
7/9/2018
Doc Name Note
For (RN7)
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Colowyo Coal Company
Permit Index Doc Type
Findings
Email Name
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Proposed Decision and Findings of Compliance July 2018 <br />Permit Renewal No. 7 P a g e | 9 <br />MR-139 MR-139 updated Map 28 - Topsoil Handling-South Area of the PAP to correct <br />topsoil replacement locations. <br /> <br />MR-140 MR-140 provided the as-built drawing for the Work Area Pond to reflect the <br />reconstruction of the primary spillway and the removal of the de-watering valve. <br /> <br />MR-141 MR-141 updated Exhibit 23A of the PAP to include in-pit drilling locations. <br /> <br />MR-142 MR-142 incorporated two new substation locations and two new topsoil windrow <br />locations. <br /> <br />MR-143 MR-143 incorporated a geotechnical drilling program related to the Collom haul <br />road. <br /> <br />MR-144 MR-144 revised the footprint for Topsoil Stockpile 16C and direct haul of topsoil <br />from Topsoil Pile 16I. <br /> <br />MR-145 MR-145 approved a coal stockpile located within the West Pit to allow <br />advancement of spoil grading. <br /> <br />MR-146 MR-146 approved a stream buffer zone variance for historical and pre-existing <br />mine related structures in Taylor Creek, Good Spring Creek, and the West Fork of <br />Good Spring. <br /> <br />MR-147 MR-147 adjusted ground clearance under sections of power lines to their required <br />height. <br /> <br />MR-148 MR-148 incorporated the as-builts designs for three stock ponds constructed in the <br />West Pit reclamation during 2015. <br /> <br />MR-149 MR-149 incorporated a cumulative bond schedule for construction of the Collom <br />Haul Road in the PAP. <br /> <br />MR-150 MR-150 incorporated geotechnical drilling at fifteen sites within the disturbance <br />footprint of the Collom Facilities area, Collom Haul Road, and at the Collom Haul <br />Road/County Road 51 crossing. <br /> <br />MR-151 MR-151 documented ground disturbing activities associated with an emergency <br />access road to replace a broken power pole <br /> <br />MR-152 MR-152 documented ground disturbing activities associated with the Inactive Mine <br />Reclamation Program drilling project to abate the underground Axial Mine Fire. <br /> <br />MR-153 MR-153 revised the in-pit dill hole locations within the South Taylor Pit.
The URL can be used to link to this page
Your browser does not support the video tag.