My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-07-09_GENERAL DOCUMENTS - C1981019
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981019
>
2018-07-09_GENERAL DOCUMENTS - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2018 12:42:39 PM
Creation date
7/9/2018 12:41:41 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
General Documents
Doc Date
7/9/2018
Doc Name Note
For (RN7)
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Colowyo Coal Company
Permit Index Doc Type
Findings
Email Name
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Proposed Decision and Findings of Compliance July 2018 <br />Permit Renewal No. 7 P a g e | 10 <br /> <br />MR-154 MR-154 incorporated geotechnical drill holes in and adjacent to the Collom <br />facilities area, Collom haul road, and along the existing Colowyo paved haul road. <br /> <br />MR-155 MR-155 revised identification of interests for Elk Ridge Mining and Reclamation, <br />LLC formerly known as Western Fuels - Colorado, LLC. <br /> <br />MR-156 MR-156 updated Map 28 and Map 28B of the PAP which are the topsoil handling <br />plans for the West, East, and South Taylor Pits. <br /> <br />MR-157 MR-157 updated Exhibit 5, Item 3 - Cultural Resource Protection Plan of the PAP <br />for the Collom Mine Expansion, specifically the Culture Resources Baseline <br />Project Plan. <br /> <br />MR-158 MR-158 incorporated additional in-pit exploratory drill hole locations within the <br />South Taylor Pit. <br /> <br />MR-159 MR-159 updated Exhibit 3 of the PAP with the most current certificate of insurance <br />for Colowyo. <br /> <br />MR-160 MR-160 incorporated nine additional drill hole locations within the South Taylor <br />Pit. <br /> <br />MR-161 MR-161 incorporated two monitoring wells identified as MLC-04-02 and the Trout <br />Creek Well. <br /> <br />MR-162 MR-162 updated Map 22 of the PAP with a barrel storage building that will be <br />onsite at the Colowyo Mine. <br /> <br />MR-163 MR-163 provided responses to Midterm No. 7 and revised materials as necessary. <br /> <br />MR-164 MR-164 approved a cultural resource baseline report in accordance with Exhibit 5, <br />Item 3 of Clowyo's PAP and to satisfy Stipulations 17 and 22. <br /> <br />MR-165 MR-165 approved non-mining related disturbances that were necessary to contain <br />a wildfire within the Colowyo permit boundary. <br /> <br />MR-166 MR-166 revised the Collom groundwater monitoring plan by removing monitoring <br />well MLC-04-02 and reinstating monitoring well MLC-04-01 as well as updating <br />topsoil pile location. <br /> <br />MR-167 MR-167 incorporated all necessary information regarding the Trout Creek Well <br />that satisfied Stipulation 18. <br />
The URL can be used to link to this page
Your browser does not support the video tag.