Laserfiche WebLink
<br />Proposed Decision and Findings of Compliance July 2018 <br />Permit Renewal No. 7 P a g e | 8 <br />TR-120 TR-120 incorporated the as-built drawings and supporting documentation for the <br />Section 25 Pond, Section 36 Pond, Middle Pond and the Coal Stockpile Pond. <br />3.4 Status of Minor Revisions <br /> <br />This section identifies Minor Revisions (MR) processed since the Findings of Permit Renewal No. <br />6 (May 20, 2013). <br /> <br />MR-126 MR-126 was withdrawn. <br /> <br />MR-127 MR-127 added Exhibit 23 to the PAP and new in-pit drilling locations within the <br />South Taylor Pit. <br /> <br />MR-128 MR-128 revised Exhibit 2 with the list of individuals with current and historical <br />site control of the Colowyo Mine. <br /> <br />MR-129 MR-129 updated Rule 4 of the PAP for the South Taylor/Lower Wilson area to <br />incorporate formatting revisions. <br /> <br />MR-130 MR-130 documented a wildland fire near parcel ST001, which is east of the South <br />Taylor Pit. <br /> <br />MR-131 MR-131 revised the alignment of the South Taylor haul road south of the West Pit. <br /> <br />MR-132 MR-132 revised two parts of the PAP, including Map 1, Surface Ownership, and <br />Exhibit 1, Item 9, which is a table of surface owners. <br /> <br />MR-133 MR-133 provided an addendum to Exhibit 21, Item 1, to the report title, <br />"Geotechnical Design and Operational Consideration for Highwall Mining, South <br />Taylor Pit G78 and E/D2 Seams, and West Pit F, E, D2, and CSeams". <br /> <br />MR-134 MR-134 updated Maps 18 and 18A of the PAP showing pre-mining topography. <br /> <br />MR-135 MR-135 updated Colowyo’s permit text to describe the construction and <br />maintenance of fence on BLM lands. <br /> <br />MR-136 MR-136 revised the design of Prospect Pond. <br /> <br />MR-137 MR-137 revised the Reclamation Cost Estimate in the PAP per RN-06 and TR-99. <br /> <br />MR-138 MR-138 updated information regarding ownership and control of the Colowyo <br />Mine. <br />