Laserfiche WebLink
Newmont Mining Corporation ■ <br /> Record of Construction Report ■ <br /> VLF2 Recertification Project <br /> Subgrade and Geomembrane 9650'—9750'Elevations <br /> NewFields Project No.475.0106.026 <br /> July 3,2018 <br /> APPENDIX E.5—Geomembrane Extrusion Welding Summary <br /> APPENDIX E.6—Geomembrane Fusion Destructive Testing Summary <br /> APPENDIX E.7—Geomembrane Extrusion Destructive Testing Summary <br /> APPENDIX E.8—Geomembrane Pressure Testing Summary <br /> APPENDIX E.9—Geomembrane Defect/Repair Summary <br /> APPENDIX E.10—Geomembrane Acceptance Forms <br /> APPENDIX F—Third Party Conformance Testing Results <br /> APPENDIX F.1— Manufactured Geomembrane Conformance Testing Results <br /> APPENDIX F.2—Existing Geomembrane Conformance Testing Results <br /> y APPENDIX G—Tensiometer Calibration Certificates <br /> Page 3 <br />