Laserfiche WebLink
Newmont Mining Corporation <br /> Record of Construction Report ■ <br /> VLF2 Recertification Project <br /> Subgrade and Geomembrane 9650'—9750'Elevations <br /> Newl'ields Project No.475.0106.026 <br /> July 3,2018 <br /> RECORD OF CONSTRUCTIONS DRAWINGS <br /> 5= DRAWING 1—SLF As-Built Survey and Depth Check Between 9650' and 9750' Bench <br /> �- DRAWING 2—Geomembrane Panel Layout As-Built Between 9650' and 9750' Bench <br /> DRAWING 3—Limits of Geomembrane Damage and Geomembrane Conformance Test <br /> Sample Locations <br /> LIST OF FIGURES <br /> FIGURE 1—Destructive Sample Test Codes for Dual Hot Wedge Fusion Welds <br /> Z FIGURE 2—Destructive Sample Test Codes for Extrusion Welds with Leister Heat <br /> Seams <br /> LIST OF APPENDICES <br /> y APPENDIX A—Surveyor's Professional License <br /> APPENDIX B— Daily Observation Reports <br /> Y APPENDIX C—Soil Liner Fill Acceptance Forms <br /> y APPENDIX D—Geomembrane Quality Control Submittals <br /> APPENDIX D.1—80mil LLDPE DSMS Inventory Control <br /> APPENDIX D.2— Resumes of Installation Personnel <br /> APPENDIX D.3—80mil LLDPE DSMS Geomembrane Roll QC Certificates <br /> APPENDIX D.4—80mil LLDPE DSMS Geomembrane Resin QC Certificates <br /> APPENDIX D.5—Welding Rod Quality Control Certificates <br /> APPENDIX E—Geomembrane Installation Summaries <br /> APPENDIX E.1—Geomembrane Deployment Summary <br /> APPENDIX E.2—Geomembrane Fusion Trial Seam Summary <br /> APPENDIX E.3—Geomembrane Extrusion Trial Seam Summary <br /> APPENDIX E.4—Geomembrane Fusion Welding Summary <br /> Page 2 <br />