Laserfiche WebLink
Newmont Mining Corporation <br /> Record of Construction Report ■ <br /> VLF2 Recertification Project <br /> Subgrade and Geomembrane 9650'—9750'Elevations <br /> NewFields Project No.475.0106.026 <br /> July 3,2018 <br /> 1. INTRODUCTION <br /> NewFields Mining Design and Technical Services (NewFields) was commissioned by the Cripple <br /> Creek&Victor Gold Mining Company(CC&V),which is owned and managed by Newmont Mining <br /> Corporation (Newmont), to provide Construction Quality Assurance (CQA) for the Valley Leach <br /> Facility 2 (VLF2) Recertification Project. This Record of Construction (ROC) report certifies the <br /> subgrade preparation and geomembrane installation for the VLF2 Recertification project <br /> between the 9650' and 9750' elevations was performed within the Technical Specifications. <br /> 1.1. Definitions <br /> The following definitions apply to this report: <br /> s "Owner" is defined as Newmont Mining Corporation (Newmont) and Cripple Creek &Victor <br /> Gold Mining Company (CC&V). <br /> Y "Engineer" is a representative of NewFields,lay Janney-Moore, P.E. a registered Professional <br /> Engineer in the State of Colorado. <br /> s "CQA Monitor" is defined as the party or parties representing the Owner under the <br /> supervision of the Engineer. NewFields was the CQA Monitor for the VLF2 Recertification <br /> Project. <br /> 5- "Contractor"was Ames Construction (Ames) located at 18450 E 28th Ave.,Aurora, CO 80011. <br /> "Geomembrane Installer" was Comanco Environmental Corporation (Comanco) located at <br /> 4301 Sterling Commerce Dr., Plant City, FL 33566. <br /> "Geomembrane Manufacturer" was Agru America Inc. located at 2000 E Newlands Rd., <br /> Fernley, NV 89408. <br /> s "Surveyor" was Foresight West Surveying, Inc. (Foresight) located at 4955 Iris St., Wheat <br /> Ridge, CO, 80033. <br /> "Project Manager" is defined as a representative appointed and authorized by the Owner to <br /> act as a liaison between the Owner, the Contractor, and the Engineer. Laurin Colby acted in <br /> the capacity of the Project Manager for Newmont. <br /> 1.2. Technical Specifications <br /> All subgrade preparation, geomembrane installation, and CQA activities were performed in <br /> accordance with the approved Squaw Gulch VLF Technical Specifications revised and re-issued <br /> for construction on August 25, 2016. <br /> Page 4 <br />