My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-06-07_GENERAL DOCUMENTS - M1977410
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1977410
>
2018-06-07_GENERAL DOCUMENTS - M1977410
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2021 8:27:25 PM
Creation date
6/7/2018 1:02:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977410
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
6/7/2018
Doc Name
Correspondence
From
Calais Resources
To
DRMS
Email Name
AME
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/ Cross Gold Mine at Caribou, Colorado <br /> / Project Manager <br /> completed our forty hour safety training. Our fire extinguishers have been <br /> serviced for the year. Sturgeon Electric completed our annual grounding <br /> certification for the mines 480/240/120 volt electrical circuits. We are going <br /> through our shop supplies inventory and cleaning/arranging everything for the <br /> small scale production program. <br /> I have attached a plan map that shows the tunnel level of the Cross Gold Mine. <br /> We will be tramming the ore with a Mancha 1.5 ton battery locomotive and will <br /> use three 1.5 ton CS Card rocker dump mine cars. One flat car will be used for <br /> moving supplies in and out of the mine. Our track gauge is 18 inch on 30 pound <br /> rail. We use two ventilation fans. One is a 10 hp. 480 volt axi-vane fan that is a <br /> suction fan and pulls air from our headings and exhausts it up our escape-way <br /> shaft. The second fan is a 20 hp,480 fan that blows fresh air through a vent bag <br /> to our working headings. We are using two Midwest SF 83 Jack Leg drills for <br /> drilling. We use an Eimco 12 B track mucking machine for loading ore into the <br /> mine cars. The ore will be dumped at our outside tressel and moved each day <br /> into our large green building via our Volvo L70C front end loader. The green <br /> building has thick concrete floors and retaining walls.The building is secure and <br /> the ore will not be in contact with the outside environment. We are researching <br /> several possible milling arrangements off site for milling later in the summer or <br /> fall, but for now the ore will be stockpiled. <br /> We will continue to maintain our water discharge systems and all mine related <br /> systems in the most professional way possible to ensure full environmental <br /> compliance. <br /> Our buildings, equipment, underground workings will be maintained in a neat <br /> and orderly manor at all times. Excellence in environmental standards will be <br /> our goal to up-hold. <br /> Worker safety is our number one priority at all times. <br />
The URL can be used to link to this page
Your browser does not support the video tag.