Figure 10: Probability Distribution of Weekly Total GVB Production Rate (scfm) <br />Name_ VV ek* Oramed Volumes � m L'v' <br />Lotion -505.9 J Mean 10,&% s[d_ Oev_ fi,540.8 : <br />Pso = Median, there is a <br />50 percent probability <br />that the weekly total GVB <br />production rate will be <br />9,125.0 scfm. <br />Pio = There is a 10 <br />percent probability that <br />the weekly total GVB <br />production rate will be <br />greater than 18,815.9 <br />scfm. <br />Peo = There is a 90 <br />percent probability that <br />the weekly total GVB <br />production rate will be <br />greater than 4,294.6 <br />scfm. <br />Results of CMM Destruction Economic Analysis <br />Once the economic model was set up, Monte Carlo simulations were run which incorporated the <br />probability distributions of carbon price and GVB weekly production. The outputs of a Monte Carlo <br />simulation are forecasts of Net Present Value (NPV) (Figure 11), Internal Rate of Return (IRR) (Figure 12) <br />and Return on Investment (ROI) (Figure 13), which also are probability distributions. These forecasts are <br />presented below and in Table 3. <br />16 <br />Lognormal Distribution <br />a <br />a <br />EL <br />P1G=16,815.4 <br />Mean = 10.656.6 <br />Med is n = 9.125.0 <br />Pso - a.zsa.s <br />D.0 10,000.0 20:000.0 30,000.0 40,000.0 50,000.0 <br />Lotion -505.9 J Mean 10,&% s[d_ Oev_ fi,540.8 : <br />Pso = Median, there is a <br />50 percent probability <br />that the weekly total GVB <br />production rate will be <br />9,125.0 scfm. <br />Pio = There is a 10 <br />percent probability that <br />the weekly total GVB <br />production rate will be <br />greater than 18,815.9 <br />scfm. <br />Peo = There is a 90 <br />percent probability that <br />the weekly total GVB <br />production rate will be <br />greater than 4,294.6 <br />scfm. <br />Results of CMM Destruction Economic Analysis <br />Once the economic model was set up, Monte Carlo simulations were run which incorporated the <br />probability distributions of carbon price and GVB weekly production. The outputs of a Monte Carlo <br />simulation are forecasts of Net Present Value (NPV) (Figure 11), Internal Rate of Return (IRR) (Figure 12) <br />and Return on Investment (ROI) (Figure 13), which also are probability distributions. These forecasts are <br />presented below and in Table 3. <br />16 <br />