Laserfiche WebLink
EXHIBIT L RECLAMATION COSTS (cont) <br /> down as the lake grows . So when mining reaches the point shown <br /> on Map Exhibit F-2 the site will be over bonded. <br /> This cost estimate does not contain costs for recoiling or <br /> revegetation since the Plant Site area will be left as graveled <br /> industrial area. There is adequate gravel material on site to <br /> grade the plant site without importing it . Our cost estimate to <br /> do all of the working face reshaping is based on using a 345C Cat <br /> trackhoe, and a 140G motor grader to do final grading and shaping <br /> on the industrial area. A Cat 988 loader will be used to move <br /> and dispose of the old concrete rubble on site and to load trucks <br /> for scrap removal . The actual equipment used by the permittee <br /> may differ. The mobilization number is for a round trip from the <br /> Rocky Ford area (2 miles one way) . <br /> Description Units <br /> Grading & Shaping 12.32 acres <br /> Face length 350 ft . <br /> Cut/fill volume mine face 5 .76 cy/lft <br /> scrap removal 150 yards <br /> concrete rubble 300 yards <br /> 62A (revised 4/30/2018) <br />