Laserfiche WebLink
3. Reclamation Timetable <br /> The timetable for reclamation is approximately 1 month after mine termination. <br /> 4. Revegetation Plan <br /> The slope areas will be harrowed and drill seeded in the spring and fall with a mix consisting of <br /> the following in order to control erosion: <br /> Dry Rangeland Mix <br /> Species lbs.of PLS/Acre** <br /> Palome Indian ricegrass 6.0 <br /> Ephraim crested wheatgrass 3.0 <br /> Canbar Canby bluegrass 1.0 <br /> Sodar streambank wheatgrass 3.0 <br /> Fairway Crested Wheatgrass 0.8 <br /> Pubescent Wheatgrass 2.3 <br /> Russian Wildrye 1.3 <br /> Western Wheatgrass 0.8 <br /> Alfalfa 0.5 <br /> Forage kochia 0.1 <br /> Fourwing Saltbush 0.25 <br /> Total 6.05 <br /> After regrading, the reclaimed area should be tilled. The seed mix can then be broadcast and <br /> mulch applied over the seeding. <br /> Olathe Pit, 2018 <br />