Laserfiche WebLink
Since the pond perimeter is 1500 feet and the track hoe can reach 18 feet from the pond edge to a <br /> depth of 6 feet, this results in a volume of 6000 cubic yards or 9000 tons maximum to be mined <br /> in the permit area. <br /> Since there is no room for facilities, any gravel mined will be hauled directly to one of Western <br /> Gravel's other permitted sites for processing. The access to the site will be from South River <br /> Road, from the west to the existing pre-law access road. Gravel will be directly loaded into haul <br /> trucks and hauled to the Montrose facility of Western Gravel. <br /> There are existing stockpiles of overburden and topsoil within the permit area from the past <br /> mining activities. These will be used in final grading and reclamation. <br /> Current slopes in the South Pond are currently steep and will need to be back filled after final <br /> mining. <br /> Olathe Pit, 2018 <br />