Laserfiche WebLink
5. Minin2 Timetable <br /> Mining should be completed by the end of 2020, although fluctuations in demand could move <br /> this date earlier or later. <br /> 6. Mine Facilities and Operation <br /> As stated earlier, it is planned that there will not be any facilities on site. <br /> Water will be used to control dust on the haul roads and also on the crushing and screening <br /> operations, as necessary. This water will be obtained from the South Pond. Magnesium chloride <br /> will not be used on site to control dust at the request of the Division of Wildlife. <br /> There will be no blasting as part of this operation. <br /> 7. Fuel Storage Tanks <br /> There will be no storage of petroleum products or fuel of any kind, no SPCC plan is needed. If <br /> any fuel spill is encountered from mobile equipment, the material will be removed from the site <br /> and disposed of in an approved landfill. Also, the Division will be notified in case of any spills <br /> of any quantity on site. The portable mining equipment such as track hoe and trucks will be <br /> serviced on an as-needed basis from portable service truck making short visits to the site. Upon <br /> final reclamation, all equipment will be removed from the site. <br /> The operator commits to clearly marking the permit boundary with stakes surveyed on site. The <br /> site will use all existing roads to haul the product to its final destination. <br /> Olathe Pit, 2018 <br />