Laserfiche WebLink
May 9, 2018 C-1981-041/Roadside Portals CCW <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 9 <br />Number of Complete Inspections this Fiscal Year: 4 <br /> <br /> Page 3 of 8 <br /> <br />SAEs inspected at the site were in good condition. There were no erosional concerns noted at the reclaimed <br />parcels. Drainage at the site appeared to be reporting to the proper co ntrol features. There was no water flowing <br />during the inspection. <br /> <br />The site was dry during the inspection. There were no low spots or areas with ponded water. Rapid Creek was <br />flowing during the inspection. As noted above, the headgate at Rapid Creek remained locked, although a small <br />amount of flow was being diverted through the headgate. <br /> <br />Photo 1: The dirt blockage in the trench just to the east of the Cary “pit”. <br /> <br />Photo 2: The dirt blockage is at the bottom right corner of Photo 2. The trench then turns at the blockage and <br />leads to the Carey Pit.