Laserfiche WebLink
Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />Net correction: 0.4477 <br />1.000 <br />0.830 <br />1.000 <br />0.903 <br />0.930 <br />0.793 <br />1.000 <br />Adjusted unit 1,285.03 LCY/hr <br />production: <br />Adjusted fleet 5140.12 LCY/hr <br />production: <br />JOB TIME AND COST <br />Fleet size: 4 Dozer(s) <br />Unit cost: $0.408/LCY <br />Total job time: 3.65 Hours <br />Total job cost: $7,657 <br />(AVG.) <br />SHIFT/DA <br />(DOZ-OC) <br />(CAT HB) <br />(CAT HB) <br />(CAT HB) <br />0 <br />■ <br />