My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-04-02_PERMIT FILE - C1981019A (5)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2018-04-02_PERMIT FILE - C1981019A (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2018 6:29:30 AM
Creation date
4/25/2018 8:44:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
4/2/2018
Doc Name
Pages EX13A-TO-1 to EX13A-T18B-2
Section_Exhibit Name
Exhibit 13A Reclamation Cost Estimate
Media Type
D
Archive
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
547
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER RIPPING WORK <br />Task description: Rip Remaining South Taylor Pit Highwall <br />Site: Colowyo Coal Mine Permit Action: MT7 Permit/Job#: C1981019 <br />PROJECT IDENTIFICATION <br />Task #: 026 State: Colorado <br />Date: 4/12/2016 County: Moffat <br />User: JHB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat DI IT - 11U <br />Ripper Attachment: 1 -Shank Ripper <br />Cost Breakdown: <br />Abbreviation: None <br />Filename: C019-026 <br />Horsepower: 850 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Total Fleet Cost/Hour: $2,165.89 <br />MATERIAL QUANTITIES Selected estimating method: Seismic <br />Alternate Methods: <br />Seismic: 242,700 BCY Bank Volume: 242,700 BCY Midrange <br />Area: NA acres Rip Depth (ft): NA Volume: NA BCY or CCY <br />Source of estimated quantity: Maps 19A, 23A, 29A and 36A <br />HOURLY PRODUCTION <br />Seismic: <br />Seismic Velocity: <br />3,500 <br />Utilization % <br />Ownership Cost/Hour: <br />$194.10 <br />NA <br />Operating Cost/Hour: <br />$291.79 <br />100 <br />Ripper Operating Cost/Hour: <br />$16.70 <br />100 <br />Operator Cost/Hour: <br />$38.89 <br />NA <br />Total Unit Cost/Hour: <br />$541.47 <br />NA <br />Total Fleet Cost/Hour: $2,165.89 <br />MATERIAL QUANTITIES Selected estimating method: Seismic <br />Alternate Methods: <br />Seismic: 242,700 BCY Bank Volume: 242,700 BCY Midrange <br />Area: NA acres Rip Depth (ft): NA Volume: NA BCY or CCY <br />Source of estimated quantity: Maps 19A, 23A, 29A and 36A <br />HOURLY PRODUCTION <br />Seismic: <br />Seismic Velocity: <br />3,500 <br />feet/second <br />Area: <br />Average Ripping Depth: <br />NA <br />mph <br />Average Ripping Width: <br />NA <br />degrees <br />Average Ripping Length: <br />NA <br />feet <br />Average Dozer Speed: <br />NA <br />feet <br />Average Maneuver Time: <br />NA <br />feet <br />Production per unit area: <br />NA <br />acres/hour <br />Job Condition Correction Factors <br />Unadjusted Hourly Unit Production: <br />2,490.40 <br />Cu. yds./hr <br />Site Altitude: <br />7,600 <br />feet <br />Altitude Adj: <br />0.93 <br />(CAT HB) <br />Job Efficiency: <br />0.83 <br />(1 shift/day) <br />Net Correction: <br />0.77 <br />multiplier <br />Adjusted Hourly Unit Production: <br />1,922.34 <br />Cu. yds./hr <br />Adjusted Hourly Fleet Production: <br />7,689.36 <br />Cu. yds./hr <br />JOB TIME AND COST <br />Fleet size: 4 Grader(s) <br />Total job time: <br />31.56 <br />Unit cost: $0.282 Per cu. yd. <br />Total job cost: <br />$68,362 <br />Hours <br />
The URL can be used to link to this page
Your browser does not support the video tag.