Laserfiche WebLink
Task description: <br />BULLDOZER WORK <br />Narrow Access Road <br />Site: Colowyo Coal Mine Permit Action: MT7 <br />PROJECT IDENTIFICATION <br />Task #: 040 <br />Date: 3/25/2016 <br />User: JHB <br />State: Colorado <br />County: Moffat <br />Agency or organization name <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat DI IT - I IU <br />Horsepower: <br />850 <br />Blade Type: <br />Universal <br />Attachment: <br />1 -shank ripper <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Permii/Jub#: C1981019 <br />Abbreviation: None <br />Filename: C019-040 <br />MATERIAL QUANTITIES <br />Initial Volume: 18,750 <br />Swell factor: 1.000 <br />Loose volume: 18,750 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Materials consistency <br />description: <br />Average push <br />gradient: <br />Average site altitude: <br />Material weight: <br />100 feet <br />2,870.3 LCY/hr <br />Compacted fill or embankment 0.9 <br />5% <br />7,600 feet <br />lbs/LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: 0.900 AB.AVG. <br />Material consistency: 0.900 CAT HB)) <br />Dozing method: 1.000 GEN. <br />Utilization % <br />Ownership Cost/Hour: <br />$194.10 <br />NA <br />Operating Cost/Hour: <br />$291.79 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.89 <br />NA <br />Total unit Cost/Hour: <br />$524.78 <br />Total Fleet Cost/Hour: <br />$2,099.10 <br />MATERIAL QUANTITIES <br />Initial Volume: 18,750 <br />Swell factor: 1.000 <br />Loose volume: 18,750 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Materials consistency <br />description: <br />Average push <br />gradient: <br />Average site altitude: <br />Material weight: <br />100 feet <br />2,870.3 LCY/hr <br />Compacted fill or embankment 0.9 <br />5% <br />7,600 feet <br />lbs/LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: 0.900 AB.AVG. <br />Material consistency: 0.900 CAT HB)) <br />Dozing method: 1.000 GEN. <br />