My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-04-18_PERMIT FILE - M2018016 (5)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2018016
>
2018-04-18_PERMIT FILE - M2018016 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2021 3:12:24 AM
Creation date
4/18/2018 2:01:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2018016
IBM Index Class Name
PERMIT FILE
Doc Date
4/18/2018
Doc Name
Application
From
Empire Aggregates
To
DRMS
Email Name
MAC
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
concrete aggregate, or provide road base for any new roads within an economic distance to the <br /> site. <br /> It is extremely unlikely that any toxic or acid-producing materials will be encountered during <br /> mining as past mining efforts show the material is alluvial in nature. However, in the event that <br /> such materials are encountered,they will be covered with subsoil and topsoil from onsite <br /> stockpiles to the same depths outlined in the reclamation plan and no more mining will occur in <br /> the area. <br /> 4. Topsoil and Overburden Handling <br /> NRCS soil data classifies onsite topsoil as gravelly sandy loam and past mining and field <br /> observations predict an expected 12 inch average depth. Twelve inches of topsoil across 77.5 <br /> acres of disturbance will generate 125,033 CY of topsoil. The alluvium deposit is found directly <br /> below the topsoil; therefore, no overburden is expected onsite. If any overburden is encountered, <br /> it will be handled in accordance with the plans laid out in this application. Both topsoil and <br /> overburden will be used onsite for reclamation of mined out areas. Topsoil from initial stripping <br /> of an area will be stored in berms and stockpiles as seen on Map C-2. Any topsoil or overburden <br /> stockpile that is in place longer than 180 days will be vegetated to prevent wind erosion. <br /> 5. Water Information,Rights and Augmentation <br /> All water rights issues including: availability of water for the operation, consumption rates, dust <br /> control, etc. is presented in Exhibit G- Water Information. <br /> 6. Schedule of Operations <br /> Mining operations will occur as dictated by demand until the maximum rates described earlier in <br /> the mine plan are met. Mining, and processing will take place no more than 12 hours per day, <br /> between the hours of 7 am and 7 pm, Monday through Saturday. Product sales and trucking may <br /> take place 24 hours a day, 7 days a week. <br /> 7. Clear Creek County Impacts and Environmental Impacts <br /> The impacts to Clear Creek County will be limited. No dust is expected from the operation due <br /> to the pit and roads being watered as needed. Furthermore, the location of mining activity within <br /> DMR , <br /> April 2018 D-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.