10,000 gallon fuel tank in secondary containment (110%of tank capacity) <br /> - Portable lights with a generator for emergency after hours maintenance support <br /> The following list is the best estimate as to the equipment that will be used onsite throughout the <br /> mine life: <br /> - 3-5 Front end loaders <br /> - 2-3 Track hoes <br /> - 2-3 D-8 Bulldozer <br /> - 2 40G Motor grader <br /> - 1 4000 gallon water truck <br /> - off-highway road haul trucks (number will depend upon production needs) <br /> - 15 and 24 ton on-road haul trucks (number will depend upon production needs) <br /> Several hazardous materials will be stored and used onsite throughout the project. These <br /> materials include products associated with diesel motors, and products associated with asphalt <br /> and concrete production. All fuel tanks will have secondary containment. Some are double <br /> walled while others will be located within bermed or lined areas that have over 110%of the <br /> volume of the largest stored tank. All tanks will be kept close to the scale area at the southeast <br /> end of the pit, on the pit floor. See Map C-2. <br /> No night mining activity is scheduled for the operation; however,portable lighting may be used <br /> within the pit from time to time. Portable lights will only be used at the bottom of the pit as <br /> needed for after-hours equipment maintenance and crushing activities within winter permitted <br /> hours when days are shorter. Portable mining equipment such as loaders, dozers,trucks and <br /> excavators will be serviced on an as-needed basis onsite. Portable toilets will be used for <br /> employees. Upon reclamation, all portable equipment will be removed from the site. All mining <br /> structures onsite are shown on Map C-2. <br /> There will be no new fence around the operation as it is inside private property. No problems are <br /> expected with vandalism. The site will use all existing roads to haul the product to its final <br /> destination. It is planned that the material may be used to re-surface existing roads, make <br /> DMR _._�_.__ <br /> April 2018 D-4 <br />