My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-04-13_REVISION - C1981019 (5)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2018-04-13_REVISION - C1981019 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2018 6:54:38 AM
Creation date
4/16/2018 6:39:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
4/13/2018
Doc Name
Adequacy Review Response
From
Tri-State Generation and Transmission Association, Inc
To
DRMS
Type & Sequence
RN7
Email Name
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
April 10, 2018 <br />Page 3 <br />clarity. Please provide and updated volume 12, Section 2.05.3(3) with references to the <br />haul road discussions. <br />Response: With the manner in which Colowyo's mining permit is formatted (e.g. Volume 1 East <br />Pit/West Pit, Volume 12 South Taylor, Volume 15 Collom) the appropriate location for discussion <br />Haul Road "A" and `B" is in Volume 1 where it currently resides. Further, the South Taylor area is <br />not physically connected to Haul Road A, and is connected to the West Pit with in -pit haul roads. <br />That being said, the narrative as provided in Section 2.05.3(3) accurately reflects on the ground <br />conditions. No changes have been made in response to this comment. <br />11. Proposed Map 36Bshows Topsoil Pile 16B. Please provide an updated Map 36B. <br />Response: Map 36B has been updated as requested. <br />12. Proposed Map 35A shows two D50 Poly IDs and is missing Poly ID D51. Please provide <br />an updated proposed Map 35A. <br />Response: Both Poly IDs D50 shown on Map 35A have been removed. Both parcels were <br />approved for Phase I bond release under SL -11. An updated Map 35A has been provided and all <br />polygons associated with the approval of SL -11 have been removed. Further, under the permit <br />renewal application, dated April 7, 2017, a spreadsheet was provided to the Division that <br />corresponded to Map 35A. This spreadsheet has been revised due to the approval of SL -11 and <br />provided to the Division herein. It should be noted that this spreadsheet is not intended to become a <br />part of the PAP. <br />13. Since the submission of the Colowyo Mine RN -07 application, numerous revisions have <br />been issued and approved. The following are the approved revisions: <br />Minor Revision <br />Technical Revision <br />171 <br />108 <br />172 <br />109 <br />173 <br />110 <br />174 <br />111 <br />175 <br />112 <br />176 <br />113 <br />177 <br />114 <br />178 <br />115 <br />179 <br />- <br />180 <br />- <br />181 <br />- <br />AN EQUAL OPPORTUNITY/AFFIRi3A7IVE ACTION EMPLOYER <br />A Touchstone Energy Cooperative <br />
The URL can be used to link to this page
Your browser does not support the video tag.