My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-03-08_PERMIT FILE - C1981035A (5)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981035
>
2018-03-08_PERMIT FILE - C1981035A (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 5:27:05 PM
Creation date
3/22/2018 11:20:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035A
IBM Index Class Name
Permit File
Doc Date
3/8/2018
Doc Name
OPERATION PLAN - MINE PLAN AREA METHOD OF COAL EXTRACTION
Section_Exhibit Name
KII 2.05.3 Operation Plan - Mine Plan Area
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SEDIMENT POND <br />One sediment pond is utilized for the King II Mine. The sediment pond is <br />located at the southeast corner of the mine bench and sized to contain <br />the precipitation events as required by regulation. Surface runoff <br />reaches the sediment pond through a combination of sheet flow, berms, <br />culverts and "V" ditches. Detailed plans, certifications and maps can be <br />found in Appendix 11 and Maps King II -007, King II -007 A -D 8s King II - <br />007F -G. The pond contains a primary spillway at elevation 7233' and an <br />emergency spillway at elevation 7234'. The spillways are both vertical <br />24" CMP risers with oil skimmers constructed as shown on Map King 11- <br />007F, Detail 1. The spillways are always open. The minimum <br />magnitudes of storm events that will cause the spillways to discharge, <br />subtracting a 60% sediment clean-out level of 1.5 acre feet, are as <br />follows: <br />Primary Spillway: 4.36 acre feet - 1.5 acre feet = 2.86 acre feet <br />Emergency Spillway: 5.22 acre feet - 1.5 acre feet = 3.72 acre feet <br />Faces of pond embankments are stabilized with vegetation. Due to <br />evaporation and infiltration, water is not normally impounded except <br />immediately following storm events or snowmelt. While there is no <br />mechanism in place to suddenly draw down the water level, standing <br />water can be pumped as necessary to the native channel at the south <br />end of the site. Prior to water being pumped from the pond to the native <br />channel, the water will be sampled, and it will not be discharged to the <br />native channel unless it meets effluent limitations. <br />TOPSOIL <br />Sufficient suitable topsoil resources exist in the Umbarg soil map unit to <br />provide topsoil replacement depths of six inches. This replacement depth <br />will require stockpiling and ultimate replacement of 20,570 cubic yards <br />of topsoil from the A and B horizons of the Umbarg series. Topsoil was <br />salvaged and stockpiled using truck/ shovel or scraper methods. Topsoil <br />was salvaged and stockpiled during construction in piles constructed <br />adjacent to the sediment pond and north of Coal Stack Tube #2. The <br />topsoil pile is stabilized using the seed mix proposed for final <br />reclamation. To further minimize the potential for accidental <br />contamination, a berm was constructed around the perimeter of the toe <br />of the topsoil piles. The berms are of sufficient size (18" to 24" high, 4' to <br />6' wide) to prevent machinery from intruding on the topsoil stockpile. <br />GCC Energy, LLC King II Mine <br />Section 2.05.3 <br />Page 6 August 14, 2017 (RN -07 AR#2) <br />
The URL can be used to link to this page
Your browser does not support the video tag.