Laserfiche WebLink
Water contained in the sediment pond will not be discharged into the <br />Hay Gulch Ditch, but allowed to evaporate. The only water to be <br />discharged from the ponds will be from precipitation events approaching <br />or exceeding the ten year, twenty-four hour storm event. The ponds are <br />described in Section 2.05.6 and are designed to manage the precipitation <br />events as required by regulation and in accordance with the <br />requirements of GCC Energy's N.P.D.E.S permit No. CO -G-850001. <br />PONDS, IMPOUNDMENTS, AND DIVERSIONS <br />DRAINAGE PLAN <br />The drainage plan for the King II Mine consists of diversion of <br />uncontaminated water originating upstream of the mine yard, through <br />the yard to the discharge point at the south end of site. Runoff <br />generated on the yard itself will be collected and routed through the <br />sedimentation pond. <br />Refer to 2.05.6 (Hydrologic Balance) Appendix 10 & 11 and Maps King II - <br />007 A thru G for a detailed description of Mine Surface Drainage and <br />Sediment Pond design and descriptions. <br />The sediment control system for the King II Mine is comprised of <br />undisturbed area drainage ditches and one sediment pond. Designs for <br />sediment control system structures are included in Appendix 11. <br />Small Area Exemption # 1 is approximately 1.3 acres of the disturbed <br />area which lies below the sediment pond, consisting of the haul road <br />between County Road 120 and the north end of the Sediment Pond. <br />Runoff from this area will tend to collect and drain along the haul road <br />bypassing the sediment pond. Alternate sediment control measures are <br />used in this area. These measures consist of the use of rock check <br />dams, rock filters and gravel surface. This area is too small and too flat <br />to run a SEDCAD demonstration. Therefore, GCC Energy, LLC commits <br />to sampling any discharge from this area for Total Settleable Solids <br />whenever practical (when GCC Energy personnel are on-site during run- <br />off event). This runoff flows into the area on either side of the haul road. <br />UNDISTURBED AREA DRAINAGE DITCHES <br />Two undisturbed area drainage ditches convey undisturbed surface flow <br />around the disturbed area of the mine surface facilities and return the <br />flow to the native surface drainage channel below the mine bench. The <br />ditches encircle the mine disturbance. One ditch conveys surface flow <br />along the west side of the mine facilities to the native channel, while the <br />corresponding ditch drains east and south above the mine portal and <br />down the east side of the mine bench and surface facilities to the native <br />channel. These open earthen channels are sized to contain the <br />precipitation events as required by regulation. The channels are <br />stabilized with a combination of vegetation and riprap (where necessary). <br />GCC Energy, LLC King II Mine <br />Section 2.05.3 <br />Page 5 August 18, 2017 (RN -07 AR#2) <br />