Laserfiche WebLink
Truck/Loader Worksheet Cont'd <br />Truck Travel (Haul & Return) Time: <br />penetration 5.0 <br />Haul Route: <br />Task# 012 Page of <br />Road Condition: Rutted dirt, little maintenance, no water, 2" tire <br />Seg # <br />HaulDistance <br />Grade (%) <br />Roll. Res <br />TotalRes <br />Velocity <br />Travel <br />Travel <br />Time <br />(Ft) <br />N <br />N <br />(fpm) <br />Time <br />LCY/Hour Adjustedforjob efficiency: <br />800.36 LCY/Hour <br />(min) <br />1 <br />2700.00 <br />mm <br />1 <br />2700.00 <br />4.00 <br />5.00 <br />9.00 <br />977 <br />2.823 <br />HaulTime: 2.823 minutes <br />Return Rnute- <br />CIRCES Cost Estimating So$ware <br />Seg # <br />HaulDistance <br />(Ft) <br />Grade (%) <br />Roll. Res <br />N <br />TotalRes <br />N <br />Velocity <br />(fpm) <br />Travel <br />Time <br />Loading Toolunit <br />Production <br />964.29 <br />LCY/Hour Adjustedforjob efficiency: <br />800.36 LCY/Hour <br />(min) <br />1 <br />2700.00 <br />-4.00 <br />5.00 <br />1.00 <br />3569 <br />0.919 <br />3 <br />Truck(s) Selected NumberofTrucks: <br />CIRCES Cost Estimating So$ware <br />Return Time: 0.919 <br />minutes <br />Total Truck Cycle Time: 7.292 <br />minutes <br />Loading Toolunit <br />Production <br />964.29 <br />LCY/Hour Adjustedforjob efficiency: <br />800.36 LCY/Hour <br />Truck Unit Production <br />323.99 <br />LCY/Hour Adjusted forjob efficiency: <br />268.91 LCY/Hour <br />Optimal No. ofTrucks: <br />3 <br />Truck(s) Selected NumberofTrucks: <br />3 Truck(s) <br />Adjustedhourly truck teamproduction: 806.72 <br />LCY/Hour <br />Adjustedsingletruck/loaderteamproduction: 800.36 <br />LCY/Hour <br />Adjustedmultipletruck/loaderteamproduction: 800.36 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: <br />1 <br />Team(s) Totaljobtime: 10.74 <br />Hours <br />Unit cost: <br />$1.897 <br />/LCY Totaljobcost: $16,301 <br />CIRCES Cost Estimating So$ware <br />