Laserfiche WebLink
Truck/LoaderWorksheet Cont'd Task# 012 <br />Payload Capacity: 48.05 LCY <br />Truck Bed (volume) Basis <br />Struck Volume: <br />35.00 <br />LCY <br />Heaped Volume: <br />46.50 <br />LCY <br />Average Volume: <br />40.75 <br />LCY <br />Adjusted Volume: <br />46.50 <br />LCY <br />Final Truck Volume Based on Number ofL.oaderPasses: <br />Loading Tool Capacity <br />Rated Capacity: _ <br />Bucket Fill Factor: _ <br />Adjusted Capacity: <br />Job Condition Corrections: <br />11.250 <br />0.875 <br />Page 2 of <br />39.38 LCY <br />Bucket Size Class: NA <br />LCY (heaped) <br />Loose material- 1" and over <br />Site Altitude (ft.): 7100 feet <br />Source <br />Job Efficiencv: 1 0.830 1 0.830 1 (CAT HB) I <br />0.875 <br />Net Correction: 1 0.830 1 0.830 I <br />Loading Tool Cycle Time: Numberof Loading Tool Passes Required to Fill <br />Truck: <br />Excavators and Front Shovels: <br />Machine Cycle Time vs. Job Condition Rating: NA <br />Selected Value within this Basic Rating: NA <br />TrackLoaders —Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: <br />A , nn <br />4 passes <br />Wheel and TrackL.oaders-Unadjusted Basic Loader Cycle Time (load, dump, 0.600 mutes <br />maneuver): <br />Cycle Time Factors <br />0.700 <br />Factor min.) <br />Source <br />Material: <br />Mixed material 0.02 <br />0.020 <br />Cat HB) <br />Stockpile: <br />Conveyor or dozer pfled 10 ft. high orless <br />0.01 <br />0.010 <br />(Cat HB) <br />Truck Ownership: <br />Common ownership of trucks and loaders - <br />0.04 <br />_0.040 <br />(Cat HB) <br />Operation: <br />Constant operation -0.04 <br />-0.040 <br />(Cat HB) <br />Dump Target: <br />Nominal target 0.00 <br />0.000 <br />Cat HB <br />Net Cycle Time Adjustment: -0.050 minutes <br />Adjusted Loader Cycle Time: 0.550 minutes <br />Net Load Time per Truck: 1.750 minutes <br />Truck Cvcle Time: <br />Truck Exchange Time: 0.70 Minutes <br />Truck Load Time: 1.750 Minutes <br />Truck Maneuver and Dump 1.10 Minutes <br />Time: <br />Adjus ted for s ite altitude: <br />0.700 <br />Minutes <br />Adjus ted for s ite altitude: <br />1.750 <br />Minutes <br />Adjustedforsitealtitude: <br />1.100 <br />Minutes <br />CIRCES Cost Estimating So$ware <br />