Laserfiche WebLink
Page 1 of <br />TRUCK/LOADER TEAM WORK <br />Taskdescription: Replace Topsoil from Stockpile BA#3 to W-5 <br />Site: Lorencito Canyon Mne Permit Action: RN4 Permit/Job#: C1996084 <br />PROJECT IDENTIFICATION <br />Task#: 012 State: Colorado <br />Date: 8/16/2017 County: Las Animas <br />User: CCW <br />Agency or organization name <br />HOURLY EQUIPMENT COST <br />Support <br />(`nc f Rraalr rinwn <br />DRMS <br />.oaaer iearn -irucx: <br />-Loader: <br />zipment -Load Area: <br />-Dump Area: <br />ince -Motor Grader: <br />-Water Truck: <br />Tnirlcl narlerTPam <br />umment Uescnntton <br />Abbreviation: None <br />Filename: C084-012 <br />Shift basis: 1 nerday <br />Cat 773F <br />CAT 990H high lift <br />Cat D9T - 9SU <br />Cat D9T - 9SU <br />CAT 14M <br />Water Tanker, 5,000 Oral. <br />.,n nnnrt Fmi inment <br />Maintenance Fouinment <br />Total work team cost/hour: $1,517.92 <br />10 F.11 I 014 ITUIVI 16111 <br />Initial volume: 7,640 CCY Swell factor: 1.125 <br />Loosevolume: 8,595 LCY <br />Source ofestimatedvolume: Table 2.05.4-1f <br />Source ofestimatedswellfactor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2,550 <br />Description: Earth - <br />Rated Payload: 122,52, <br />Pounds/LCY <br />CIRCES Cost Estimating So$ware <br />Truck <br />Loader <br />Load Area <br />Dump Area <br />Motor <br />Grader <br />WaterTruck <br />%Utilization -machine: <br />100 <br />100 <br />50 <br />100 <br />25 <br />25 <br />Ownership cost/hour: <br />$107.96 <br />$126.84 <br />$100.59 <br />$100.59 <br />$54.68 <br />$24.01 <br />Operating cost/hour: <br />$81.97 <br />$118.18 <br />$43.62 <br />$87.23 <br />$11.75 <br />$8.53 <br />%Utilization -riper: <br />NA <br />0 <br />50 <br />0 <br />NA <br />NA <br />Ripperown. cost/hour. <br />NA <br />$0.00 <br />$10.94 <br />$10.94 <br />$0.00 <br />$0.00 <br />Ripperop. cost/hour: <br />NA <br />$0.00 <br />$3.41 <br />$0.00 <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$31.17 <br />$41.20 <br />$41.85 <br />$41.85 <br />$28.90 <br />$21.39 <br />Unit Subtotals: <br />$221.10 <br />$286.22 <br />$189.46 <br />$229.67 <br />$95.33 <br />$53.94 <br />Numberof Units: <br />3 <br />1 <br />1 <br />1 <br />1 <br />1 <br />Group Subtotals: <br />Work: <br />$949.52 <br />Support: <br />$419.13 <br />Maint: <br />$149.27 <br />Total work team cost/hour: $1,517.92 <br />10 F.11 I 014 ITUIVI 16111 <br />Initial volume: 7,640 CCY Swell factor: 1.125 <br />Loosevolume: 8,595 LCY <br />Source ofestimatedvolume: Table 2.05.4-1f <br />Source ofestimatedswellfactor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2,550 <br />Description: Earth - <br />Rated Payload: 122,52, <br />Pounds/LCY <br />CIRCES Cost Estimating So$ware <br />