Laserfiche WebLink
Truck/Loader Worksheet Cont'd <br />Truck Travel (Haul & Return) Time: <br />penetration 5.0 <br />HaulRoute: <br />Task # 011 Page 3 of3 <br />Road Condition: Rutted dirt, little maintenance, no water, 2" tire <br />Seg # <br />HaulDistance <br />Grade (%) <br />Roll. Res <br />Total Res <br />Velocity <br />I Irave <br />(Ft) <br />(Ft) <br />(%) <br />(%) <br />(%) <br />(fpm) <br />Time <br />LCY/Hour Adjustedforjobefficiency: <br />800.36 LCY/Hour <br />Truck Unit Production <br />(min) <br />1 <br />1500.00 <br />min <br />1 <br />1500.00 <br />3.00 <br />5.00 <br />8.00 <br />1023 <br />1.523 <br />HaulTime: 1.523 minutes <br />Return Route: <br />Seg # <br />HaulDistance <br />Grade (%) <br />Roll. Res <br />TotalRes Velocity <br />Travel <br />Total Truck Cycle Time: 5.677 <br />(Ft) <br />Loading Toolunit <br />(%) <br />(%) (fpm) <br />Time <br />Production <br />964.29 <br />LCY/Hour Adjustedforjobefficiency: <br />800.36 LCY/Hour <br />Truck Unit Production <br />(min) <br />1 <br />1500.00 <br />-3.00 <br />5.00 <br />2.00 3569 <br />0.604 <br />CIRCES Cost Estimating Sotware <br />Return Time: 0.604 <br />minutes <br />Total Truck Cycle Time: 5.677 <br />minutes <br />Loading Toolunit <br />Production <br />964.29 <br />LCY/Hour Adjustedforjobefficiency: <br />800.36 LCY/Hour <br />Truck Unit Production <br />416.15 <br />LEY/Hour Adjusted forjob efficiency: <br />345.41 LCY/Hour <br />Optimal No. ofTrucks: <br />2 <br />Truck(s) Selected NumberofTrucks: <br />2 Truck(s) <br />Adjustedhourly truck teamproduction: 690.81 <br />LCY/Hour <br />Adjustedsingletruck/loaderteamproduction: 690.81 <br />LCY/Hour <br />Adjustedmultipletruck/loaderteamproduction: 690.81 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: <br />1 <br />Team(s) Totaljobtime: 2.98 <br />Hours <br />Unit cost: <br />$1.860 <br />/LCY Totaljobcost: $3,830 <br />CIRCES Cost Estimating Sotware <br />