Laserfiche WebLink
<br /> <br />BULLDOZER WORK <br /> <br />Task description: Regrade Topsoil for Raw Water Line Expansion (MR182) <br />Site: Colowyo Coal Mine Permit Action: MR182 Permit/Job#: C1981019 <br /> <br />PROJECT IDENTIFICATION <br />Task #: 001 State: Colorado Abbreviation: None <br />Date: 3/19/2018 County: Moffat Filename: C019-001 <br />User: ZTT <br />Agency or organization name : DRMS <br /> <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D11T - 11U <br />Horsepower: 850 <br />Blade Type: Universal <br />Attachment: 1-shank ripper <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown : <br /> Utilization % <br />Ownership Cost/Hour: $226.13 NA <br />Operating Cost/Hour: $183.90 100 <br />Ripper own. <br />Cost/Hour: $21.79 NA <br />Ripper op. Cost/Hour: $11.30 100 <br />Operator Cost/Hour: $41.85 NA <br />Total unit Cost/Hour: $484.97 <br />Total Fleet Cost/Hour: $484.97 <br /> <br />MATERIAL QUANTITIES <br />Initial Volume: 160 <br />Swell factor: 1.000 <br />Loose volume : 160 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell <br />factor: <br />Cat Handbook <br /> <br />HOURLY PRODUCTION <br />Average push distance: 100 feet <br />Unadjusted hourly <br />production: <br />2,870.3 LCY/hr <br />